MULTISPECIALITY HOSPITAL 350 BEDS

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

DETAILING CONCEPTION

The Project was planned in order to provide better health care facilities in eastern UP.
Varanasi has more than 100 hospitals set ups .With around 25-100 bedded facility every footfall of OPD in Varanasi is around 10000 patients everyday with 4000-5000 IPD on daily basis.Benaras Hindu University (BHU) alone is a very big hospital set up with more than 2000 beds but still patients do not get adequate medical facility and bed on time.Varanasi cater lot of patients from Bihar and its periphery region.

We have selected our location based on patients comes from Bihar which is a majority of patient share in Varanasi. Lots of patient itself comes from HINDALCO, Renukoot. (A unit of Aditya Birla Group). We have a target to cater patients from West Bihar, Mirzapur, Chandauli, Ghazipur, Sonebhdra, Hindalco, Shakti Nagar, Vindhnagar etc.

Being on national highway we have great advantage to benefit patients by saving their precious time of travelling to Varanasi city which takes another 40 minutes from our location to reach the hospital in city.Being the largest infrastructure in private hospital sector in whole Purvanchal we have ability to incorporate any special requirements of super specialization such as bunker for Onco- treatment, nursing college etc.Currently we have started Urology department with one of our modular operation theatres. Being a new start up we have started our exercise to get registered in Ayushman, Insurances and TPA’s.

We have four full time Doctors with us:

• Dr. Vinit Kumar Singh, MBBS, MS, M.Ch Urology.

• Dr. Priyanshu Singh, MBBS, MD Medicine.

• Dr. Monika Singh, BDS, MDS.

• Dr. Vishnu Kumar, BAMS.

• Vishal Kumar Singh, M.S USA- Biomedical Engineering.

? All other consultants are available 24 x 7 on call basis.

? Pathology Set up is already up and working.

? PNDT and DL has been applied and due in June 2022.

We are in a process of approval from Ayushman Bharat which we are likely to get in two weeks. Other tie ups and CGHS such as Hindalco Renukoot, NTPC, Reliance Power, Indian Oil, Railways, SBI, PSU. Banks, Insurance CO. is in pipeline.

SERVICES

In First and Second Phase we have a plan for following services (Some services are already up and running in present time).
• Medicine
• Urology
• General Surgery
• Neurology
• Oncology
• Gynecology
• Cardiology
• Nephrology
• Orthopedics
• Dental
• Pathology
• Paramedical College of 200 seats
• Medical Shop
• Restaurant.

• INTRODUCTION
• OVERVIEW OF HEALTHCARE INDUSTRY
• EMPLOYMENT GENERATION POTENTIAL OF HEALTH SECTOR
• BUSINESS AND INVESTMENT CLIMATE
• OVERARCHING POLICY LANDSCAPE
• DRIVERS OF GROWTH
• WHAT LICENSE REQUIRED TO OPEN A HOSPITAL AND THEIR PROCEDURE
• B.I.S SPECIFICATION
• MODERN MEDICAL INSTRUMENTS
• IMPORTED PLANT & MACHINERY SUPPLIERS
• LIST OF CONSULTANT FOR SETTING UP HOSPTAL
• HOSPITAL/MEDICAL EQUIPMENTS AND SUPPLIERS
• PROPOSED MINIMUM STANDARDS FOR PRIVATE HOSPITALS
• INSTRUMENTS AND EQUIPMENT
• BUILDING ENGINEERING ENVIRONMENTAL STANDARDS
• EXPLANATION OF TERMS USED IN THE PROJECT REPORT
• PROJECT LOCATION
• IMPLEMENTATION SCHEDULE

APPENDIX – A:

01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)

Category: Tag:

Description

• INTRODUCTION
• OVERVIEW OF HEALTHCARE INDUSTRY
• EMPLOYMENT GENERATION POTENTIAL OF HEALTH SECTOR
• BUSINESS AND INVESTMENT CLIMATE
• OVERARCHING POLICY LANDSCAPE
• DRIVERS OF GROWTH
• WHAT LICENSE REQUIRED TO OPEN A HOSPITAL AND THEIR PROCEDURE
• B.I.S SPECIFICATION
• MODERN MEDICAL INSTRUMENTS
• IMPORTED PLANT & MACHINERY SUPPLIERS
• LIST OF CONSULTANT FOR SETTING UP HOSPTAL
• HOSPITAL/MEDICAL EQUIPMENTS AND SUPPLIERS
• PROPOSED MINIMUM STANDARDS FOR PRIVATE HOSPITALS
• INSTRUMENTS AND EQUIPMENT
• BUILDING ENGINEERING ENVIRONMENTAL STANDARDS
• EXPLANATION OF TERMS USED IN THE PROJECT REPORT
• PROJECT LOCATION
• IMPLEMENTATION SCHEDULE

APPENDIX – A:

01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)

Additional information

Plant Capacity

354 Nos./Day

Land & Building

(6960 sq.mt.)

Plant & Machinery

us$ 3202857

Rate of Return

12%

Break Even Point

70%