The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Nylon is a generic term for the long chain synthetic polyamides. Nylon 6 and Nylon 6,6 are two most important polyamides. Nylon 6 is manufactured by self-condensation of 6-amino caproic acid obtained from caprolactam. Like all other polyamides Nylon 6 is capable of being formed into a filament in which the polymer molecules are oriented, at large, in the direction of the axis. It can also be cut to small lengths to get staple fibres. NFY can be manufactured with varied degree of orientation such as low oriented yarn (conventional), partially oriented yarn (POY) and full oriented yarn (FOY). NFY is produced as multi-filament yarn or mono filaments in a wide range of deniers. It is also available in bright, semi-dull and dull lusters. The filament yarn is generally specified by denier/no, of filaments/ twist e.g. 76/36/2500 means that the yarn is of 76 denier having 36 number of filament and has been given 2500 twists per metre length. NFY is commonly manufactured in round cross sections but special cross sections such as triangular or multi-lobal are now being produced.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

10000.00 Mtr/Day

Land & Building

Area 1000 Sq.Mtr Rs. 1.44 Cr

Plant and Machinery

Rs. 1.05 Cr

Working Capital for 3 Months

Rs. 1.09 Cr

Total Capital Investment

Rs. 3.70 Cr

Rate of Return

23%

Break Even Point

55%