The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

  P.V.C. BATTERY SEPARATOR
[CODE NO1552]

Amongst the various systems and devices that are  available for  converting electrical energy to some form of storage  energy for  reconversion to electrical energy, lead storage battery is the most  effective  system  available.   The  use  of storage batteries is far and wide, and mainly in the field of automobile, telephone exchange, submarines, aircrafts etc. Before 1946, most separators used in storage batteries were of wood and since then, these have been replaced either by PVC or micrporous rubber which are highly suitable.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

50000 Nos/Day

Land & Building

Area 1500 sq.Mtr Rs. 1.29 Cr

Plant and Machinery

Rs. 60.00 Lacs

Working Capital for 2 Months

Rs. 51.37 Lacs

Total Capital Investment

Rs. 2.70 Cr

Rate of Return

31%

Break Even Point

51%