P.V.C. PIPES AND FITTINGS

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

One hospital bed out of four in the world is occupied by a  patient  who is ill because of polluted water.   Provision  of safe  and  convenient water supply is the single  most  important activity  that  could  be under taken to improve  the  health  of people living in rural areas of the developing countries – it  is the statement of world health organisation.

Water  makes  life  possible,  and it  is  difficult  to imagine  any programme for human development or improvement  that does  not  pre-suppose or require a readily available  supply  of water.

  Project Report Covers:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

2.00 MT/Day

Land and Building

Area 4000 Sq.Mtrs. Rs. 1.22 Cr

Plant & Machinery

Rs.45.00 Lacs

Working Capital 3 Months

Rs. 1.51 Cr

Total Capital Investment

Rs. 3.25 Cr

Rate of Return

19%

Break Even Point

69%