Description
INTRODUCTION
TYPES OF PAPER BAGS
1. FLAT BAGS:
2. SQUARE BOTTOM (PINCH BOTTOM) BAGS:
3. SATCHEL-BOTTOM BAGS:
4. AUTOMATIC SELF-OPENING-SQUARE 9SOS0 BOTTOM BAGS:
5. WINDOW BAGS:
6. BALER BAGS:
SIZE OF PAPER BAGS
SIZES OF PAPER BAGS (FINISHED)
USES AND APPLICATIONS
B.I.S. SPECIFICATION
QUALITY CONTROL AND STANDARDS
FOR KRAFT PAPER
PROPERTIES OF PAPER
BURSTING STRENGTH:-
INTERNAL TEARING STRENGTH:-
OPPORTUNITY IN PAPER BAGS
RAW MATERIALS
MARKET OVERVIEW OF PAPER BAGS
TOP TEN BRANDS ADOPTING PAPER BAGS IN INDIA
KEY PLAYERS OF PAPER BAGS MARKET IN INDIA
MARKET POSITION OF INDIAN PACKAGING INDUSTRY
PACKAGING & ALLIED INDUSTRIES – THE SOUTH INDIA SCENARIO
GLOBAL MARKET SCENARIO OF PAPER BAGS
PRESENT MANUFACTURERS/SUPPLIERS OF PAPER SHOPPING BAGS
STEPS INVOLVED IN PAPER BAGS MANUFACTURING
TECHNIQUE AND PROCESSES OF PAPER BAG PRODUCTION
1) DESIGN
2) PROOFING
3) PRINTING
4) FILM
THE COATING PROCESS AND BAG POINTS TO NOTE:
5) SURFACE FINISHING
6) DIE-CUTTING PROCESS
PAPER BAGS SHOULD PAY ATTENTION TO THE DIE-CUTTING PROCESS:
7) PASTE BOX
PAPER BAGS MUST FIRST MAKE A PASTE MADE THE FIRST PIECES
OF TECHNOLOGY PLANNING.
PROCESSING DETAILS OF PAPER BAGS
PROCESS OF MANUFACTURE
ROTARY MACHINE FOR MANUFACTURING PAPER CARRY BAGS
FEED:
FLEXOGRAPHIC PRINTING UNITS:
SCORING SECTION:
SIDE FLAP GUMMING SECTION:
SIDE FLAP FOLDING SECTION:
BOTTOM BLOCK GUMMING AND FOLDING SECTION:
STAGGERING SECTION:
DRYING SECTION:
SEGMENT SEPARATING SECTION AND ALIQNER SECTION:
EYELETING SECTION:
TAG FITTING:
DRIVE:
COMPARATIVE STUDY OF PAPER BAGS AND PLASTIC BAGS
PAPER BAGS VS. PLASTIC BAGS
ENERGY AND NATURAL RESOURCES
POLLUTION
POLLUTANTS PAPER VS. PLASTIC
RECYCLING
DEGRADABILITY
EFFECTS:
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE
SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
DETAILS OF THE MACHINERY
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF RAW MATERIALS
COMPLETE PLANT AND MACHINERY SUPPLIERS (IMPORTED)
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)