pe based carbon black compounds

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Carbon black is an important constituent in polyethylene Compounds used in the manufacture of pressure pipes for the Distribution of potable water and gas. The use of specialty p-Type carbon blacks provides for the most cost effective means of Achieving the necessary level of UVstabilization without Compromising the ultimate performance requirements of these Pressure pipes. The star diagram is a visual and useful means of Comparing differing types of carbon black for their relative Suitability for use in pressure pipe applications. The star Diagram shown below compares the performance of cabot specialty P-type carbon blacks together with a typical conventional or General purpose grade of carbon black commonly used for non-Critical performance applications. The efficiency of carbon black As a uv absorber primarily depends on the primary particle size.
At a constant loading in polyethylene, carbon black aggregates, Based on fine primary particles will present a proportionately Larger surface area to incident uv – and hence a superior uv Absorbing efficiency – than that of a coarser grade of carbon Black.

Project Report covers:

  • Introduction
  • Uses and Applications
  • Properties
  • Market Survey with future aspects
  • Present Manufacturers
  • B.I.S. Specifications
  • Manufacturing Process with Formulae
  • Plant Layout
  • Cost Economics with Profitability Analysis
  • Capacity
  • Land & Building Requirements with Rates
  • List & Details of Plant and Machinery with their Costs
  • Raw Materials
  • Details/List and Costs
  • Power & Water Requirements
  • Labour/Staff Requirements
  • Utilities and Overheads
  • Total Capital Investment
  • Turnover
  • Cost of Production
  • Break Even Point
  • Profitability
  • Land Man Ratio
  • Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant capacity

10 mt./day

Land & building

(area 5000 sq.mt.) Us$ 13.20 lacs

Plant & machinery

US$ 1.72 lacs

W.c. for 2 months

US$ 7.84 lacs

Total capital investment

US$ 23.66 lacs

Rate of return

57%

Break even point

34%