PET BOTTLES
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.
Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.
While PET bottle development was proceeding in the US, a large manufacturer of injection moulding machines in Japan, was leading a project to develop a machine to make biaxially oriented PP (polypropylene) containers. They recognized that the prototype machine could be used to produce the new PET bottles and, in December 1975, the One-stage ASB-150 injection stretch blow moulding machine for making the new biaxial oriented PET bottles was unveiled. All one-stage injection stretch blow moulding machines derived from this original Stretch Blow design are referred to as classic one-stage machines, as the concept has long since been extended into other PET developments. The classic one-stage machines design is extremely versatile in that the same basic machine design can be used to make a wide variety of bottles and jars in all shapes and sizes, which was the standard single-stage machine in the early years, had eight cavities for 1.5 litre bottles.
Project Reports Cover:
- Introduction
- Uses and Applications
- Properties
- Market Survey with future aspects
- Present Manufacturers
- B.I.S. Specifications
- Manufacturing Process with Formulae
- Cost Economics with Profitability Analysis
- Capacity
- Land & Building Requirements with Rates
- List & Details of Plant and Machinery with their Costs
- Raw Materials
- Details/List and Costs
- Power & Water Requirements
- Labour/Staff Requirements
- Utilities and Overheads
- Total Capital Investment
- Turnover
- Cost of Production
- Break Even Point
- Profitability
- Land Man Ratio
- Suppliers of Plant & Machineries and Raw Materials.