POTASSIUM NITRATE

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

POTASSIUM NITRATE
CODE NO. 1573

Potassium Nitrate is the most important ingredient of mixed fertilizers.   Most of the Potassium nitrate,   (KNO3) produced, commercially,  in the United States is based on the  reaction  of potassium  chloride.  The reaction is manipulated  chemically  to yield chlorine as a coproduct.  The process is typical than other process, because in this process nitrosyl chloride is the product during the reaction.  This is very dangerous compound.

PROJECT REPORT COVERS:

  •         Introduction
  •         Uses and Applications
  •         Properties
  •         Market Survey with future aspects
  •         Present Manufacturers
  •         B.I.S. Specifications
  •         Manufacturing Process with Formulae
  •        Cost Economics with Profitability Analysis
  •         Capacity
  •         Land & Building Requirements with Rates
  •         List & Details of Plant and Machinery with their Costs
  •         Raw Materials
  •         Details/List and Costs
  •         Power & Water Requirements
  •         Labour/Staff Requirements
  •         Utilities and Overheads
  •         Total Capital Investment
  •         Turnover
  •         Cost of Production
  •         Break Even Point
  •         Profitability
  •         Land Man Ratio
  •         Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

100.00 MT/Day

Land and Building

Area 6 Acres Rs. 11.52 Cr

Plant & Machinery

Rs. 9.00 Cr

Working Capital for 2 Months

Rs. 14.25 Cr

Total Capital Investment

Rs. 37.72 Cr

Break Even Point

62%