Description
INTRODUCTION
PROPERTIES & CHARACTERISTICS OF ENZYME
STONE ENZYMES WASH
IN STONE WASH, THE FOLLOWING POINTS SHOULD BE
CAREFULLY CHECKED:
A) SIZE OF THE STONES:
B) GARMENT-STONE RATIO:
YOU MAY ALSO LIKE: STONE WASHING PROCESS OF DENIM FABRIC
C) WASHING TIME:
D) QUANTITY OF THE BLEACH:
OBJECTS OF STONE ENZYME WASH:
PROCESS OF STONE ENZYME WASH:
FIRST STEP: PRETREATMENT/DESIZING
SECOND STEP: HOT WASH
THIRD STEP: ENZYME STONE WASHING
YOU MAY ALSO LIKE: STONE WASH PROCESS OF GARMENT STONEWASH WITH CHLORINE
FOURTH STEP: BLEACHING
FIFTH STEP: NEUTRAL WASH
SIXTH STEP: SOFT WASH
SEVENTH STEP: HYDRO-EXTRACTOR MACHINE
EIGHTH STEP: DRYING MACHINE
B.I.S. SPECIFICATION
OVERVIEW OF TEXTILE AND GARMENT INDUSTRY IN BANGLADESH
CURRENT SCENARIO OF DENIM MARKET OF BANGLADESH
TOP FOREIGN DENIM BUYER OF BANGLADESH
SWOT ANALYSIS OF DENIM SECTOR OF BANGLADESH
STRENGTH OF BANGLADESH DENIM INDUSTRY
WEAKNESS OF BANGLADESH DENIM INDUSTRY
OPPORTUNITIES OF BANGLADESH DENIM INDUSTRY:
THREATS OF BANGLADESH DENIM INDUSTRY
TEXTILE ENZYMES MARKET
GLOBAL TEXTILE ENZYMES MARKET SEGMENTATION ANALYSIS
TEXTILE ENZYMES MARKET, BY TYPE
TEXTILE ENZYMES MARKET, BY APPLICATION
TEXTILE ENZYMES MARKET, BY GEOGRAPHY
KEY PLAYERS
PRESENT MANUFACTURE OF STONE FREE ENZYMES
INDUSTRIAL APPLICATIONS OF ENZYMES IN TEXTILES
TEXTILES PROCESSING
STONEWASHED JEANS WITHOUT STONES
YARN TREATMENT
RAW MATERIALS DETAILS
PROTEOLYTIC ENZYMES
ANIONIC SURFACTANTS
SODIUM LAURYL SULPHATE
OTHERS IN THIS GROUP ARE:-
NON-IONIC SURFACTANT
SESQUESTRANT
SODIUM SESQUISILICATE
ENZYMES CLASSIFICATION FOR TEXTILE PROCESSING
HYDROLASES
AMYLASES
PECTINASES
PECTIN ESTERASES:
POLYGALACTURONASES:
PECTIN LYASES:
PROTEASES
LIPASES/ESTERASES
OXIDOREDUCTASES
PEROXIDASE/GLUCOSE OXIDASE
FORMULATION OF POWDER ENZYMES [STONE FREE]
MANUFACTURING PROCESS OF POWDER ENZYMES (STONE FREE)
PROCESS FLOW DIAGRAM
FORMULATION OF ENZYMES USED FOR DENIM CLOTH AND GARMENT WASHING (POWDER FORM)
PROCESS FLOW DIAGRAM
PRINCIPLES OF PLANT LAYOUT
STORAGE LAYOUT:
EQUIPMENT LAYOUT:
SAFETY:
PLANT EXPANSION:
FLOOR SPACE:
UTILITIES SERVICING:
BUILDING:
MATERIAL-HANDLING EQUIPMENT:
RAILROADS AND ROADS:
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
ADDRESSES OF RAW MATERIAL SUPPLIERS
SUPPLIERS OF ALKALINE PROTEASES
SUPPLIERS OF ACETAMIDE
SUPPLIERS OF SODIUM LAURYL SULPHATE
SUPPLIERS OF SEQUESTRANT
SUPPLIERS OF SODIUM SILICATE
SUPPLIERS OF SODIUM SULPHATE
ADDRESSES OF PLANT AND MACHINERY
SUPPLIERS OF PULVERISER
SUPPLIERS OF MIXERS
SUPPLIERS OF STORAGE TANKS
SUPPLIERS OF VIBRATORY SCREEN
RAW MATERIALS CALCULATION/MONTH
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)