Description
INTRODUCTION
CHARACTERISTICS OF PVC
UN-PLASTICIZED POLY VINYL CHLORIDE
EDGEBAND MATERIALS
PVC EDGEBAND
ABS EDGEBAND
PP EDGEBAND
BENEFITS OF UPVC
CHARACTERISTICS AND APPLICATION OF PVC EDGEBANDING
MARKET OVERVIEW OF PVC EDGEPANDING
EDGE BANDING MATERIALS MARKET: SEGMENTATION BY MATERIAL TYPE:
MANUFACTURING PROCESS PVC EDGEBANDING
PROCESS FLOW DIAGRAM OF PVC EDGE BANDING
TYPES OF EXTRUDERS
SINGLE SCREW EXTRUDER:
SIMPLE PLASTIC SINGLE SCREW EXTRUDER.
TWIN SCREW EXTRUDER:
DIE FLOWS
A TYPICAL PROFILE EXTRUSION DIE.
DETAILS OF PLASTIC EXTRUSION
SECTIONAL VIEW OF A SIMPLE PLASTIC EXTRUDER.
DETAILS OF EDGEBANDING PROCESSING
ADHESIVES
WOOD MOISTURE
FEED RATE
RATES OF ADHESIVE APPLICATION
PRESS ROLLERS
EXTRACTION
MILLING
BUFFING
MANUAL PROCESSING
MECHANICAL CHARACTERISTICS
RESISTANCE TO ABRASION
BALL INDENTATION/SHORE HARDNESS
RESISTANCE TO WARP UNDER HEAT
VARNISHING
CLEANING
DISPOSAL
PROCESSING PARAMETERS IN EDGEBANDING
PROCESSING TEMPERATURE OF ADHESIVE
PROCESSING TEMPERATURE OF BOARD AND EDGING
FIXING QUALITY
RATE OF FEED
AMOUNT OF ADHESIVE TO BE APPLIED
REMOVAL BY SUCTION
MILLING
END MILLING
BUFFING
INTERMEDIATE STORAGE
PAINTING OF EDGEBANDS
WORK CYCLE IN EDGEBANDING MACHINE
MACHINE SET-UP IN RELATION TO MATERIAL PROPERTIES
TROUBLE SHOOTING IN EDGEBAND PROCESSING
PROCESSING AND TESTING OF PVC EDGE BANDING
FIGURE 1. EDGE BANDS TYPES AND THICKNESSES
FIGURE 2. EXPERIMENTAL CUPBOARD
TEST METHODS
EXPERIMENTAL USE OF MATERIALS
TEST LABORATORY PROPERTIES
EQUIPMENT AND FUNCTIONS
LABORATORY PROCESSING
TEST SAMPLE PREPARATION
DATA ANALYSES AND EXPERIMENTS
PRODUCTION LINE OF PVC PROFILE
PROFILE PRODUCTION LINE MODELS
QINGDAO XINQUAN UPVC PROFILE PRODUCTION LINE SJSZ65 /
BLOCK DIAGRAM OF THE PRODUCTION
TWIN SCREW EXTRUDER SJSZ65/132
SZD-2400 VACUUM CALIBRATING STAND
SQY-240 HAUL-OFF
SQG-160 CUTTING MACHINE
SFZ-6000 TILT STACKER
QINGDAO WEIER PROFILE PRODUCTION LINE SJSZ-65/132
DETAIL TECHNICAL PARAMETER OF THE PRODUCTION LINE
VACUUM FIXED STAND
HAUL OFF
AUTOMATIC CUTTING MACHINE
TILTING TABLE
TIPS AND HINTS IN EDGEBAND PROCESSING
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TERM LOANS:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF PLANT AND MACHINERY (IMPORTED)
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF INSTRUMENTATION & PROCESS CONTROL EQUIPMENTS
SUPPLIERS OF LABORATORY EQUIPMENTS
SUPPLIERS OF D.G. SETS
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF PVC RESIN
SUPPLIERS OF PRINTING INKS
SUPPLIERS OF PACKAGING MATERIALS
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)