RADIO TAXI

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Radio  Taxi  is a great concept for comfortable  travel  and particularly  for  traveling long distances across  the  city  as driving or taking the ordinary taxi is not a very good option.

Current State

The not very modern taxi company has asked you to develop  a computer-based booking and planning system. At present, there  is an  operator receiving phone calls from customers.  The  customer can  book  a taxi for a future occasion. The  operator  registers such  bookings  in a schedule. The customer can also  ask  for  a transport at soon as possible. The operator then makes a  request by phone to a planner, who has radio communication with the  taxi cars. The planner gives an estimated time it would take to  reach the customer. If booking is acknowledged by the customers:earfact customers  wright  reserves  many invoices and  emers  which  pay directly to the taxi driver.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

50 Cabs

Land & Building

Area 50000 Sq.Mtr Rented

Plant and Machinery

Rs. 2.74 Cr

Working Capital for 1 Month

Rs. 26.24 Lacs

Total Capital Investment

Rs. 3.27 Cr

Rate of Return

23%

Break Even Point

70%