RCC HUME PIPES (REINFORCED CONCRETE CEMENT)
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.
Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.
RCC HUME PIPES (REINFORCED CONCRETE CEMENT)
RCC Hume pipes are made of a mixture of Portland cement, sand and aggregate in the proportion of 1:2:5:2.5 with steel rods and wires as reinforcement material. These pipes are manufactured in diameters ranging from 300 mm to 2200 mm or more. The RCC pipes are suitable for irrigation, culvert construction, sewerage and drainage purposes. Transportation of water, sewerage, effluents or other liquid slurries in these pipes is quite smooth. Seepage or leakage is totally avoided by proper jointing & sealing of two consecutive pieces of the pipe line. Hume pipes have reasonably good load-bearing capacity, and hence, can be laid either underground or over the ground. Carefully made pipes, tested as per IS: 458-1971, are available in a wide range of sizes for use. Well constructed steel wire/rod cage is concentrically placed inside the pipe mould where premixed concrete is charged for pipe casting. The rotating moulds receive the feed material through open ends at both ends.
PROJECT REPORT COVERS:
- Introduction
- Uses and Applications
- Properties
- Market Survey with future aspects
- Present Manufacturers
- B.I.S. Specifications
- Manufacturing Process with Formulae
- Cost Economics with Profitability Analysis
- Capacity
- Land & Building Requirements with Rates
- List & Details of Plant and Machinery with their Costs
- Raw Materials
- Details/List and Costs
- Power & Water Requirements
- Labour/Staff Requirements
- Utilities and Overheads
- Total Capital Investment
- Turnover
- Cost of Production
- Break Even Point
- Profitability
- Land Man Ratio
- Suppliers of Plant & Machineries and Raw Materials.