The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Most  crude  oils and fats, whether  obtained  by  pressing, solvent extraction or rendering are given a preliminary  cleaning and clarification treatment by setting, screening, filtration  or centrifugation to make them more resistant against  deterioration during  storage.   When  required for edible  purposes  they  are nearly always given a further refining treatment.

In  most  cases, however, some refining  treatment  must  be applied depending on the nature of the impurities and undesirable constituents  and on the purposes for which the oil is  required.  The impurities may be of the following types.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

40.00 MT/Day

Land & Building

Area 1 Acre Rs. 1.32 Cr

Plant and Machinery

Rs. 89.5 Lacs

Working Capital for 2 Months

Rs. 9.31 Cr

Total Capital Investment

Rs. 11.89 Cr

Rate of Return

23%

Break Even Point

45%