RESIDENTIAL COMPLEX (TOWNSHIP)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Planning  Age Never in the history of man, planning has  been  so much  in  the forefront as it is today. The whole  world  is  now passing  through  the  planning age.  Without  planning,  nothing succeeds. So we have Defence Planning at national level, Regional Planning,  Urban and Rural Planning at state level so on  and  so forth to Family Planning at domestic level. Our India has so  far already implemented its Seventh Five Year Plan (1985-90) for  the development of the country in all its fields.

Concept of Planning Planning means pre-thinking and pre-arranging things before an event takes place so as to achieve good  results in  health,  convenience,  comfort and happiness  of  all  living beings. By careful planning, we can eradicate the mistakes of the past and be wiser in the future.

   Project Report Covers:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

1500 Flats/Day

Land and Building

Area 968000 Sq.Yards Rs.3.65 Arab

Plant & Machinery

Rs. 4.30 Cr

Working Capital for 1 Month

Rs. 3.97 Cr

Total Capital Investment

Rs. 5.19 Arab

Rate of Return

126%

Break Even Point

14%