RUBBER GOODS FROM WASTE RUBBER

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

       By  the  application of heat and chemical agents  to  ground vulcanized  waste  rubber a substantial  regeneration  of  rubber compound  to its original plastic state is effected,  yielding  a product known as Reclaim or Reclaimed rubber.

It is capable of being processed compounded or revulcanised. The  process  is essentially one of  depolymerisation.  Reclaimed Rubber  has  become  widely  accepted as  a  raw  material  which possesses  processing  and economic characteristics that  are  of great  value in  the compounding of natural and synthetic  rubber stock.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

2000.00 Kgs/Day

Land & Building

Area 3000.00 Sq.Mtr Rs. 1.91 Cr

Plant and Machinery

Rs. 89.79 Lacs

Working Capital for 3 Months

Rs. 1.15 Cr

Total Capital Investment

Rs. 4.06 Cr

Rate of Return

24%

Break Even Point

59%