SCHOOL OF FOREIGN LANGUAGES

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

           Foreign   language   courses  are  designed  to   meet   the fundamental objectives of learning Japanese language, namely,  to obtain  the  vocabulary and grammar of  Japanese,  to  comprehend Japanese,  to  communicate in day-to-day  social  situations,  to demonstrate  one’s  interest in Japan – her culture,  people  and life,  and to make business contacts and friends. The faculty  of JLS has been trained to guide the student to understand important Japanese  and  customs behavioural norms, both  on  business  and social fronts.

School provides students with specially developed text books written  in  Roman alphabets – in the same it is done  the  world over.  Text  books  are supplemented by  reading  material,  home assignments  and audio tapes. Additional material is provided  to students  for  learning basic script which is later  followed  by prescribed  reading material for advanced courses. It  should  be  created  teaching methods that best suit Indian students  helping them  to  complete  courses  in shorter  time  spans  than  would ordinarily be required by beginners. The faculty also guides  the students at every stage to understand important Japanese  customs and behavioural norms.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

13.00 Class/Day

Land & Building

Area 1000 Sq.Mtr Rs. 50.90 Lacs

Plant and Machinery

Rs. 50.18 Lacs

Working Capital for 1 Month

Rs. 9.65 Lacs

Total Capital Investment

Rs. 1.24 Cr

Rate of Return

27%

Break Even Point

69%