Description
INTRODUCTION
SMART ENERGY METERS
PARAMETERS MEASURED BY THE DEVICE
FEATURE OF SMART ENERGY METER
SMART METER INCLUDES
POWER SUPPLY:
MEASUREMENT CAPABILITY:
PROCESSING:
COMMUNICATIONS:
POWER SUPPLY
SENSING & MEASUREMENT
PROCESSING AND CONTROL
WIRELESS COMMUNICATIONS INTERFACES
THE EIGHT ESSENTIAL COMPONENTS
CURRENT TRANSFORMER:
POWER CONVERTER:
PROCESSOR:
MODEM:
INTERNAL BATTERY:
OPERATOR INTERFACE:
COVER TAMPER SWITCH:
HALL EFFECT SENSOR:
ADVANTAGES OF SMART METERS FOR CONSUMERS
DISADVANTAGES OF SMART METERS FOR CONSUMERS
ADVANTAGES OF SMART METERS FOR ELECTRIC COMPANIES
DISADVANTAGES OF SMART METERS FOR ELECTRIC COMPANIES
USES AND APPLICATION
B.I.S. SPECIFICATION
PROCESS FLOW CHART
MANUFACTURING PROCESS
CONSTRUCTIONAL REQUIREMENT
(A) FABRICATION OF ELECTRONICS PARTS
SPECIFICATION OF COMPONENTS
(1) CURRENT ELEMENT
(2) MEASUREMENT/COMPUTING CHIPS
(3) MEMORY CHIPS
(4) DISPLAY MODULES
(5) ELECTRONIC COMPONENTS
(6) MECHANICAL PARTS
(7) BATTERY
(8) RTC/MICRO CONTROLLER
QUALITY ASSURANCE PLAN
QUALITY SHOULD BE ENSURED AT THE FOLLOWING STAGES:
QC STEPWISE INSPECTIONS IN MANUFACTURING PROCESS
ENERGY METER – QUALITY CONTROL AND STAGE INSPECTION:
TESTING OF METER
(A) TYPE TEST
(B) ACCEPTANCE TEST
(C) ROUTINE TEST
MARKING OF THE METER
PACKING & FORWARDING
(B) FABRICATION OF BOX
CONSTRUCTION
HINGES:
EARTHING BOLT:
FIXING ARRANGEMENT:
SEALING ARRANGEMENT:
INCOMING AND OUTGOING CABLE ARRANGEMENT:
BASE AND COVER DETAILS:
MARKING/EMBOSSING:
MARKET POSITION
SMART METERS MARKET IS EXPECTED TO GROW AT A CAGR OF 6.7%.
SMART METERS MARKET AND TOP COMPANIES
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF SMART ENERGY METER
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF MICRO CONTROLLER
SUPPLIERS OF MAX 232
SUPPLIERS OF RS 232 CONNECTOR
SUPPLIERS OF 4X4 MATRIX KEY PAD
SUPPLIERS OF LCD DISPLAY
SUPPLIERS OF TIMER IC 555
SUPPLIERS OF IR SENSOR
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS FOR PCB ASSEMBLING PLANT
SUPPLIERS OF CNC PCB DRILLING MACHINE
SUPPLIERS OF PCB CUTTING MACHINE
SUPPLIERS OF PCB CLEANING MACHINE
SUPPLIERS OF HEAT WAVE SOLDERING MACHINE
SUPPLIERS OF OSCILLOSCOPE
SUPPLIERS OF SOLDERING IRON
SUPPLIERS OF ENERGY METER TESTING EQUIPMENTS
SUPPLIERS OF ELECTRICAL MEASURING INSTRUMENTS
SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS
SUPPLIERS OF AIR CONDITIONING EQUIPMENTS
SUPPLIERS OF AIR COMPRESSORS
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF JIGS AND FIXTURE
SUPPLIERS OF SUBMERSIBLE WATER PUMP
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)