SODIUM FORMATE

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Sodium  formate  (sodium salt of formic Acid) HCOONa  is  an important compound having versatile field  of application and the material  shall be in the form of white granules  or  crystalline powder or aqueous solution with slight odour of formic acid.

It finds its application in the manufacture of formic  acid, oxalic  acid, organic chemical and in the manufacture  of  sodium dithionite.

It is used as a reducing agent and analytical chemistry as a precipitant  for  the  noble metals it also act  as  a  buffering agent.

The demand of the product is increasing day by day.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

3.00 MT/Day

Land & Building

Area 2000 Sq.Mtr Rs. 1.20 Cr

Plant and Machinery

Rs. 71.50 Lacs

Working Capital for 3 Months

Rs. 89.75 Lacs

Total Capital Investment

Rs. 2.92 Cr

Rate of Return

16%

Break Even Point

66%