Description
INTRODUCTION
BIO BRICKS
ADVANTAGE OF WOOD ASH BRICK
OBJECT OF SEASONING
METHODS OF STACKING
THE ONE AND NINE METHODS OF STACKING SLEEPERS
CLOSE CRIB METHOD
CLOSE CRIB METHOD
FENCE POST STACKING
SEASONING METHOD
(I) AIR SEASONING OR NATURAL SEASONING.
(II) KILN SEASONING OR ARTIFICIAL SEASONING.
WOOD FURNITURE MARKET IN INDIA
PLYWOOD IS CONSTITUTING LARGE SHARE OF WOODEN FURNITURE
MARKET IN INDIA
OVERVIEW OF BUILDING CONSTRUCTION IN INDIA
GROWTH OF CONSTRUCTION INDUSTRY: INDIAN STORY
CONSTRUCTION INDUSTRY
DEMAND OF RAW MATERIAL
POLLUTION AND DESTRUCTION OF NATURE
PROCESS OF MANUFACTURE OF WOODEN FURNITURE
FEEDING SPEED OF SAWS IS DETERMINED AS FOLLOWS:
(A) FOR CIRCULAR SAW U = UZ NZ/1000
(B) FOR BAND SAW U = 60U X U/T
WOOD WORKING PROCESSES
FLOW DIAGRAM FOR WOOD FURNITURE MANUFACTURING
HAZARDS AND PRECAUTIONS
MACHINING SAFETY
BAND SAW
TABLE SAW
SPECIFIC GUIDELINES ARE AS FOLLOWS:
PUSH STICKS
FEATHER BOARDS AND COMBS
ROUTER
JOINTER
SHAPER
LATHE
RIPSAW
RADIAL ARM SAW
PROCESS FLOW DIAGRAM OF WOODEN FURNITURE
DIFFERENT WAYS FOR SEASONING WOOD
MOISTURE CONTENT OF WOOD
KILN SEASONING
AIR DRYING
SOLAR DRYING
MICROWAVE SEASONING
MANUFACTURE OF BIO BRICKS
MANUFACTURING PROCESS OF WOOD ASH BRICKS
SIEVING OF MATERIAL
MIXING OF MATERIALS
MOULDING OR SHAPING OF BRICKS
DRYING OF BRICKS
FIRING OF BRICKS
TESTING OF BRICKS
MATERIALS SELECTION OF INGREDIENTS OF WOOD ASH BRICKS
WOOD ASH
CHARACTERISTICS OF WOOD ASH
CHEMICAL PROPERTIES
PHYSICAL PROPERTIES
TESTING OF WOOD ASH BRICKS
WEIGHT OF DRY BLOCK
SIZE OF BLOCK
COMPRESSIVE STRENGTH
WATER ABSORPTION
EFFLORESCENCE TEST
PROCESS FLOW DIAGRAM OF BIO BRICKS
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS: 58
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF WOOD SEASONING PLANT
SUPPLIERS OF RAW MATERIALS
APPENDIX – A:
1. COST OF PLANT ECONOMICS
2. LAND & BUILDING
3. PLANT AND MACHINERY
4. FIXED CAPITAL INVESTMENT
5. RAW MATERIAL
6. SALARY AND WAGES
7. UTILITIES AND OVERHEADS
8. TOTAL WORKING CAPITAL
9. COST OF PRODUCTION
10. PROFITABILITY ANALYSIS
11. BREAK EVEN POINT
12. RESOURCES OF FINANCE
13. INTEREST CHART
14. DEPRECIATION CHART
15. CASH FLOW STATEMENT
16. PROJECTED BALANCE SHEET