STEEL PLANT (EAF-BASED)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

International steel making capacity  is estimated to have reached 2.36 billion tons in 2013-14 and is projected to increase to 2.66 billion tons by 2017-18.  Non -OECD economies will continue to lead the capacity expansion in the global steel industry, with their share of world capacity expected to increase to 72.6% in 2017. China has been the largest EAF steel producer in the world since 2007-08 and its EAF crude steel production reached a record high of 73.0 mmt, corresponding to 16.1% of global crude steel production via the EAF process. There is a good demand of steels in India.

Each ‘EIRI’ MARKET OVERVIEW CUM DETAILED TECHNO ECONOMIC FEASIBILITY REPORT (Complete Report) tentatively covers
•    Introduction
•    Properties
•    BIS (Bureau of Indian Standard) Specifications & Requirements
•    Uses & Applications
•    Present Indian Market Overview/Position
•    Export & Import Statistics Data
•    Names and Addresses of Existing Units (Present Manufactures)
•    List of Plant & Machineries
•    Miscellaneous Items and Accessories
•    Instruments, Laboratory Equipments and Accessories
•    Electrification, Electric Load and Water
•    Maintenance, Suppliers/Manufacturers of Plant and Machineries
•    Manufacturing Process with Formulations (If applicable)
•    Flow Sheet Diagram
•    List of Raw Materials
•    Availability of Raw Materials
•    Requirement of Staff & Labour
•    Personnel Management
•    Skilled & Unskilled Labour
•    Requirement of Land Area
•    Built up Area
•    Plant Layout
Along with financial details as under:
•    Summary of Capital Cost of Project
•    Land & Side Development Exp.
•    Buildings
•    Plant & Machineries
•    Misc. Fixed Assets
•    Technical Know how Fees & Exp.
•    Preliminary Expenses
•    Pre-operative Expenses
•    Provision for Contingencies
Below mentioned financial statements (Annexure) will be  for 5 to 10 Years
•    Annexure:: Cost of Project and Means of Finance
•    Annexure:: Output, Profitability and Cash Flow Chart
•    Annexure:: Assessment of Working Capital requirements
•    Annexure:: Sources of Finance
•    Annexure:: Balance Sheets
•    Annexure:: Break-Even Analysis and profitability analysis.
•    Annexure:: Quantitative Details-Output/Sales/Stocks
•    Annexure:: Sales Realisation
•    Annexure:: Raw Material Cost
•    Annexure:: Other Raw Material Cost
•    Annexure:: Packing Material Cost
•    Annexure:: Consumables, Store etc.,
•    Annexure:: Employees Expenses
•    Annexure:: Fuel Expenses
•    Annexure:: Power/Electricity Expenses
•    Annexure:: Repairs & Maintenance Exp.
•    Annexure:: Other Mfg. Expenses
•    Annexure:: Administration Expenses
•    Annexure:: Selling Expenses
•    Annexure:: Depreciation Charges – Profitability
•    Annexure:: Depreciation Charges
•    Annexure:: Interest and Repayment – Term Loans
•    Annexure:: Tax on Profit
•    Annexure:: Assumptions for Profitability workings
•    Annexure:: Assessment of Working Capital

Additional information

Plant Capacity

200.00 MT./day

Land and Building

Area 3 Acres Rs. 1.05 Cr

Plant & Machinery

Rs. 1.86 Cr

Working Capital for 2 Months

Rs. 12.56 Cr

Total Capital Investment

Rs. 15.79 Cr

Rate of Return

76%

Break Even Point

44%