Steel transmission line tower and Rolling mill to produce steel sections

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

The transmission line towers are comparatively light Structures and the maximum wind pressure is the main criterion For their design. The concurrence of earth quake & intensified Wind pressures may also be considered in the earth quake – prone Areas for design of the overhead transmission line towers. These Towers are fabricated by means of bolted joints only. The Structural steels of well specified quality only are used in Construction of transmission line towers to ensure the Permissible stresses and other design details. Practices Followed in material selection, design, fabrication, testing and Must suit the field conditions of this country. Various design Considerations are adopted in the design of self-supporting Steel lattice towers for overhead transmission lines, including Loads, combination of loads, permissible stresses, wind Pressures likely to be experienced during service and atmospheric Corrosion intensity. This project does not propose to manufacture Guyed towers & special towers for river crossings or other Large spans. The intention is to produce overhead electric power Transmission line towers to be used in plains.

Project Report covers:

  • Introduction
  • Uses and Applications
  • Properties
  • Market Survey with future aspects
  • Present Manufacturers
  • B.I.S. Specifications
  • Manufacturing Process with Formulae
  • Plant Layout
  • Cost Economics with Profitability Analysis
  • Capacity
  • Land & Building Requirements with Rates
  • List & Details of Plant and Machinery with their Costs
  • Raw Materials
  • Details/List and Costs
  • Power & Water Requirements
  • Labour/Staff Requirements
  • Utilities and Overheads
  • Total Capital Investment
  • Turnover
  • Cost of Production
  • Break Even Point
  • Profitability
  • Land Man Ratio
  • Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant capacity

500 mt./day

Land & building

(area 5 acres) Rs. 434 lacs

Plant & machinery

Rs. 1,098 lacs

W.c. for 2 months

Rs. 11,183 lacs

Total capital investment

Rs. 12,939 lacs

Rate of return

79%

Break even point

21%