The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

         The degree of development of source of energy to accomplish useful work is one of the measures of industrial progress. The discovery of sources of energy in nature, the transmission of energy in its various of energy to a more serviceable form  are essential  parts  of  an industrial economy.  An electric power system is one of the tools of consorting and transporting energy.

•    PRODUCT INTRODUCTION
•    USES & APPLICATIONS
•    MARKET POSITION OF STEEL TUBULAR POLES
•    MARKING OF POLES
•    LIST OF THE END USERS/CUSTOMERS OF STEEL TUBULAR POLES
•    PRESENT MANUFACTURERS/SUPPLIERS OF STEEL TUBULAR POLES
•    B.I.S. SPECIFICATIONS
•    SELECTION OF POLES
PROCESS OF MANUFACTURE
•    MANUFACTURING PROCESS
•    MANUFACTURING PROCESS
•    Plant layout
•    PRINCIPLES OF PLANT LAYOUT
•    PLANT LOCATION FACTORS
•    EXPLANATION OF TERMS USED IN THE PROJECT REPORT
•    PROJECT IMPLEMENTATION SCHEDULES
COMPLETE PLANT SUPPLIERS
•    SUPPLIERS OF PLANT AND MACHINERY
•    SUPPLIERS OF RAW MATERIALS

APPENDIX –A

01.    PLANT ECONOMICS
02.    LAND & BUILDING
03.    PLANT AND MACHINERY
04.    OTHER FIXED ASSESTS
05.    FIXED CAPITAL
06.    RAW MATERIAL
07.    SALARY AND WAGES
08.    UTILITIES AND OVERHEADS
09.    TOTAL WORKING CAPITAL
10.    TOTAL CAPITAL INVESTMENT
11.    COST OF PRODUCTION
12.    TURN OVER/ANNUM
13.    BREAK EVEN POINT
14.    RESOURCES FOR FINANCE
15.    INSTALMENT  PAYABLE IN 5 YEARS
16.    DEPRECIATION CHART FOR 5 YEARS
17.    PROFIT ANALYSIS FOR 5 YEARS
18.    PROJECTED BALANCE SHEET FOR (5 YEARS)

Category: Tag:

Additional information

Plant Capacity

50.00 MT./day

Land and Building

Area 4000 Sq.Mtr Rs 2.7 Cr

Plant & Machinery

Rs1.41 Cr

Working Capital for 1 Month

Rs. 8.41 Cr

Total Capital Investment

Rs.12.57 Cr

Rate of Return

86%

Break Even Point

22%