Description
INTRODUCTION
CATEGORIES OF TELESCOPIC CHANNELS
TELESCOPIC CHANNEL PRODUCT TYPE
TELESCOPIC CHANNEL/RUNNER MATERIAL
TELESCOPIC CHANNEL/RUNNER BY MOUNTING TYPE
KEY FEATURES REQUIRED IN TELESCOPIC DRAWERS
MATERIAL USED FOR MANUFACTURING OF TELESCOPIC
DRAWER CHANNELS
STAINLESS STEEL
TYPE 302 STEEL
IRON
B.I.S. SPECIFICATION
PROCESS FLOW CHART OF TELESCOPIC DRAWER CHANNEL
MANUFACTURING PROCESS OF TELESCOPIC DRAWER CHANNEL
ROLL FORMING PROCESS
METAL CUTTING PROCESS
RIVETING
BENDING
QUALITY CONTROL
INCOMING INSPECTION
FACTORY FLOOR PROCESS CONTROL
FINAL INSPECTION
PLANT AND MACHINERY
DRAWER SLIDES ROLL FORMING MACHINE
PROCESS OF SLIDES ROLL FORMING
CUSTOMIZED ROLL FORMING LINES
MARKET POSITION
MARKET SIZE AND FORECAST (US$ MN)
GLOBAL TELESCOPIC CHANNEL MARKET DRIVERS
PESTEL ANALYSIS
MARKET OUTLOOK
KEY PLAYERS IN OPERATION
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE
SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF TELESCOPIC CHANNEL
SUPPLIERS OF RAW MATERIALS
SUPPLIER OF STEEL SHEET
SUPPLIER OF BEARING BALLS
SUPPLIERS OF PLASTIC STOPPERS AND OTHER SMALL ITEMS
SUPPLIERS OF PLANT AND MACHINES
SUPPLIERS TELESCOPIC DRAWER CHANNEL PRODUCTION LINE
SUPPLIERS OF DG SETS
SUPPLIERS OF POWER TRANSFORMERS
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF EXHAUST FAN
SUPPLIERS OF TESTING EQUIPMENTS
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)