TGPC (TETRA GOLD POTASSIUM CYANIDE, 57%)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Tetra Gold Potassium Cyanide KAu(CN)4 is an important chemicals of Gold  Electroplating. For any step of the Gold plating finishing the use of TGPC is a must. This kind of Gold in its salt status is the main core of these chemical treatment and it is necessary to be sure of its purity and content percentage.

The colourless transparent liquid keeps relatively stable acidity. Product is especially free from heterogeneitries formed during its process thereby maintaining high purity.

INTRODUCTION
USES AND APPLICATION
MARKET SURVEY
PRESENT MANUFACTURERS/SUPPLIERS OF TETRA GOLD POTASSIUM CYANIDE
RAW MATERIALS
DETAILS OF GOLD COMPOUNDS
ELECTRODEPOSITION OF GOLD
STRUCTURE AND TOXICITY OF POTASSIUM CYANIDE
MANUFACTURING PROCESS OF TETRA GOLD POTASSIUM CYANIDE
RAW MATEIALS REQUIREMENTS
PROCESS FLOW DIAGRAM
DETAILS OF PROVEN BATH SOLUTION USING TETRA GOLD POTASSIUM CYANIDE
MATERIAL SAFETY DATA SHEET OF GOLD CHLORIDE
STANDARD OPERATING PROCEDURES USING POTASSIUM CYANIDE
COMPOSITION OF GOLD PLATING BATHS
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF PLANT & MACHINERIES

APPENDIX –A

01.    PLANT ECONOMICS
02.    LAND & BUILDING
03.    PLANT AND MACHINERY
04.    OTHER FIXED ASSESTS
05.    FIXED CAPITAL
06.    RAW MATERIAL
07.    SALARY AND WAGES
08.    UTILITIES AND OVERHEADS
09.    TOTAL WORKING CAPITAL
10.    TOTAL CAPITAL INVESTMENT
11.    COST OF PRODUCTION
12.    TURN OVER/ANNUM
13.    BREAK EVEN POINT
14.    RESOURCES FOR FINANCE
15.    INSTALMENT  PAYABLE IN 5 YEARS
16.    DEPRECIATION CHART FOR 5 YEARS
17.    PROFIT ANALYSIS FOR 5 YEARS
18.    PROJECTED BALANCE SHEET FOR (5 YEARS)

Category: Tag:

Additional information

Plant Capacity

250.00 GM/day

Land and Building

Area 350 Sq.Mtrt Rs. 55.00 Lacs

Plant & Machinery

Rs.4.20 Lacs

Working Capital for 1 Month

Rs 86.34 Lacs

Total Capital Investment

Rs.1.47 Cr

Rate of Return

44%

Break Even Point

35%