Description
INTRODUCTION
SIZES OF OTR TYRES RETREATED (RADIAL AND CROSS PLY):
DUMP TRUCKS:
LOADERS & GRADERS:
TYPES OF TYRES TO BE
PROJECT LOCATION-CHENNAI
MAP OF DISTRICT
CLIMATE
TRANSPORTATION
TRANSPORTATION WITHIN THE CITY
TYPES OF TYRE RETREADING
COLD RETREADING
POINTS TO NOTE:
HOT RETREADING
ARGUMENTS IN FAVOUR OF HOT RETREADING:
POINTS TO NOTE:
CONSTRUCTION OF TYRES
TYRES – THEIR CONSTRUCTION & MAINTENANCE
TIRE COMPONENTS
BASIC COMPONENTS /TYRE CONSTRUCTION
TREAD
SIDEWALL
PLIES
CARCASS OR CORD BODY
BEAD
BELTS
LINER
BREAKERS
STEEL BREAKERS
A SUBSET OF TYRE CONSTRUCTION: TYRE TREADS.
TREAD PATTERNS
TYRE DIMENSIONS
ASPECT RATIO
OVERALL DIAMETER
OVERALL WIDTH
SECTION WIDTH
TREAD WIDTH
TREAD DEPTH
SECTION HEIGHT
RIM WIDTH
NOMINAL RIM DIAMETER
STATIC LOADED RADIUS
LOADED WIDTH
MINIMUM DUAL SPACING
REVOLUTIONS PER MILE (RPM)
LOAD RATING
INFLATION PRESSURE
SPEED RATING
CONSTRUCTION
PR (PLY RATING)
TYRE USE CLASSIFICATIONS
PASSENGER AND LIGHT TRUCK
RUN-FLAT TYRE
HEAVY DUTY TRUCK TYRES
OFF-THE-ROAD (OTR)
AGRICULTURAL
RACING
INDUSTRIAL
BICYCLE
AIRCRAFT
MOTORCYCLE
BIAS/CROSSPLY & RADIAL TYPES OF TYRES
RADIAL TYRES
BIAS /CROSS PLY TYRES
THE REASONS FOR THIS LIMITED USE OF BIAS TYRES ARE:
TYRE RETREADING COMPOUND:
IN RETREADING UNIT:
HYDRAULIC HOIST:
HYDRAULIC JACK:
PRODUCT & ITS APPLICATION
B.I.S. OR OTHER INTERNATIONAL STANDARDS OF SPECIFICATION
PROPERTIES
MANUFACTURING PROCESS
RETREADING PROCESS
THERE ARE SIX KEY STAGES TO THE RETREADING PROCESS:
INITIAL INSPECTION
BUFFING
PREPARATION
BUILDING
CURING
FINAL INSPECTION
LIST OF MACHINERY
RETREAD EQUIPMENT
RETREAD CONSUMABLES
RETREADING TOOLS
REPAIR EQUIPMENT
PROS & CONS OF TIRE RETREADING
PROS OF TIRE RETREADING
CONS OF TYRE RETREADING
MARKET POSITION
TYPES OF RETREADERS
INNOVATION IS KEY TO ADVANCING THE SECTOR
MARANGONI-GRP
MAJOR PLAYERS IN THE SAME MOULD FOR EXPANSION
HANKOOK-TIRE
GLOBAL RETREAD TIRE MARKET: SEGMENTATION
ASIA-PACIFIC CONTINUES TO BE THE LARGEST MARKET
COMPETITIVE LANDSCAPE
PRESENT MANUFACTURERS
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TERM LOANS:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
COMPLETE PLANT SUPPLIERS
SUPPLIERS OF OTHERS PLANT AND MACHINERIES
AIR COMPRESSORS
BOILERS
BUFFING MACHINE
SUPPLIERS OF RAW MATERIALS
TYRE RETREADING MATERIALS & SUPPLIES
MACHINERY PHOTOGRAPHS
TIRE BUFFER
TREAD BUILDER
ELECTRIC CURING CHAMBER
ENVELOPE EXPANDER
CEMENT CHURNER & CYCLONE FILTER
RAIL SYSTEM / MONORAIL
INSPECTION SPREADER
EXPANDABLE RIMS AND HUB
CURING RIMS & BEAD SEAL PLATE
RIMMING STATION
SNAP SEAL
TIRE STAND, TROLLEY AND SKIVING
NAIL HOLE DETECTOR
TREAD PREPARATION TABLE WITH ROTARY CUTTER
RETREAD CONSUMABLES
CURING BAG
ENVELOPE
RETREADING TOOLS
REPAIR EQUIPMENT
EXTRUDER GUN TIRE SPOTTER
PRODUCT PHOTOGRAPHS
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)