uPVC DOORS & WINDOWS PROFILES

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

PVC was produced for the first time in 1935 and has been industrially manufactured in large quantities for over 50 years. It has been developed into a material that can offer a wider range of properties and therefore has many different applications. The production process starts with sodium chloride, (common salt) from which chlorine gas is obtained by electrolysis. Petroleum or natural gas is used to produce ethylene, one of many products of the process known as cracking. Bringing together chlorine and ethylene, liquid vinyl chloride (VC) is produced which is immediately changed in the process by polymerisation into polyvinyl chloride. Vinyl chloride is toxic and therefore a closed production process is used producing PVC as a white power that is chemically stable. Polyvinyl Choride (PVC) is a chemical compound of chlorine, carbon and hydrogen. The components of PVC originate from the naturally occurring raw materials of petroleum or natural gas and common salt. The stands for unplasticised and means that the material has not been softened by the addition of chemicals known as plasticizers.

DETAILED FEASIBILITY REPORT COVERS:

  • Introduction
  • Uses and Applications
  • Properties
  • Market Survey with future aspects
  • Present Manufacturers
  • B.I.S. Specifications
  • Manufacturing Process with Formulae
  • Plant Layout
  • Cost Economics with Profitability Analysis
  • Capacity
  • Land & Building Requirements with Rates
  • List & Details of Plant and Machinery with their Costs
  • Raw Materials
  • Details/List and Costs
  • Power & Water Requirements
  • Labour/Staff Requirements
  • Utilities and Overheads
  • Total Capital Investment
  • Turnover
  • Cost of Production
  • Break Even Point
  • Profitability
  • Land Man Ratio
  • Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

4 Ton./Day

Land & Building

(Area 2500 sq.mt.) Rs. 1.21 Cr.

Plant & Machinery

Rs. 2.65 Cr.

W.C. for 3 Months

Rs. 2.43 Cr.

Total Capital Investment

Rs. 6.45 Cr.

Rate of Return

40%

Break Even Point

46%