WALL PUTTY (WHITE CEMENT BASED)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

White cement based Wall Putty a plastering material to fill the holes and patches before paint primer or distemper.

In general, fillers & stoppers are paste-like materials, highly pigmented, used to fill surface imperfections (fillers) and to make good gross surface defects prior to painting operations (stoppers).

Caulking compounds, putties and same cements have a boiled drying oil, usually combine with resins that act as the binder putty is the thick mixture of finally powdered calcium carbonate (whiting) and acid refined linseed oil which imparts good wetting and grinding characteristics.

White Cement Based Wall Putty is a specially formulated product based on white cement blended with special fillers and additives to be used as putty, filler & sealer, on concrete / mortar walls and ceiling for both interiors & exteriors. It renders to the surface, smooth bright white coating suitable for over coating by different kinds of water and solvent based paints, of attractive colors, giving a durable and smooth finish on the walls. It is water resistant and in turn, imparts additional strength to the walls. It also contains fungicides, preventing fungus. The other feature of the product is that though it is based on cement, but unlike cement paint, it does not require any water for curing.

Technical Data

Requirement of water: 40-45% mixing of paint for application
Pot life: 2 to 3 hours
Hard Drying: 6 to 8 hours
Overcoat ability: 3 to 4 hours
Maximum thickness of total coats: 1.5 mm
Covering on smooth surface: 22-25 sqft / kg / mm

Direction for Use

1. Ensure that wall surface is free from loose particles and any greasy / oily substance by cleaning the surface with emery paper, knifing blade or wire brush as suitable, and wash the wall by water properly.

2. Mix Wall Putty with 40-45% clean water slowly under hand stirring. Continue stirring till a uniform paste is formed.

3. Apply first coat uniformly on already moistened surface with the help of putty blade or trowel. Allow the surface to dry for minimum 3 hours and then apply a second coat. Allow drying for 6 to 8 hours preferably overnight for complete drying depending on ambient temperature and humidity condition.

4. After drying, if needed, the surface should be rubbed with water proof 300-320 mesh emery paper and washed with water. The surface is now ready for application of paint.

Precautions

1. Store in a cool dry place.

Category: Tag:

Description

INTRODUCTION
TECHNICAL DATA
DIRECTION FOR USE
PRECAUTIONS
USES AND APPLICATIONS
B.I.S. SPECIFICATION
MARKET POSITION
MARKET SIZE AND PAST GROWTH
MAJOR PLAYERS
KEY CHALLENGES
GROWTH DRIVERS AND FUTURE OUTLOOK
GROWTH IN URBAN HOUSING SECTOR:
GROWTH IN END-USE MARKET:
MARKET SHARE OF CONSTRUCTION CHEMICALS
GLOBAL CONSTRUCTION CHEMICALS CONSUMPTION
OVERVIEW OF CONSTRUCTION CHEMICALS
U.S. CONSTRUCTION CHEMICALS MARKET REVENUE, BY PRODUCT,
2013 – 2024 (USD MILLION)
PRODUCT INSIGHTS
END-USE INSIGHTS
REGIONAL INSIGHTS
COMPETITIVE INSIGHTS
MAJOR PLAYERS OF CONSTRUCTION CHEMICALS
PRESENT MANUFACTURERS/SUPPLIERS OF WALL PUTTY
USES AND FEATURES OF INTEGRAL WATER PROOFING COMPOUND
USES:
FEATURES:
PRECAUTION AND LIMITATION OF INTEGRAL WATER PROOFING
TECHNICAL DATA:
DOSAGE:
PACKAGING:
SHELF LIFE:
HEALTH & SAFETY:
FORMULATION OF WALL PUTTY (WHITE CEMENT BASED)
MANUFACTURING PROCESS OF DRY WALL PUTTY (WHITE CEMENT BASED)
PROPERTIES OF INTERGRAL WATER PROOFING COMPOUND IN LIQUID FORM
FORMULATION OF INTERGRAL WATER PROOFING COMPOUND
PROCESS FLOW DIEGRAM
SUPPLIERS OF PLANT & MACHINERY
SUPPLIERS OF PLANT & MACHINERIES (IMPORTED)
SUPPLIERS OF RAW MATERIALS

APPENDIX – A:

01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)

Additional information

Plant Capacity

200 MT/Day

Land & Building

(3000 sq.mt.)

Plant & Machinery

US$.564285

Rate of Return

51%

Break Even Point

34%