Description
INTRODUCTION
APPLICATION AND TOXICITY OF WHITE SPIRIT
TOXICITY
SPECIFICATION OF WHITE SPIRIT
REQUIREMENTS
GENERAL REQUIREMENTS
SPECIFIC REQUIREMENTS
TABLE 1 SPECIFIC REQUIREMENT FOR WHITE SPIRIT.
PACKAGING AND MARKING
PACKAGING
MARKING
SAMPLING
STORAGE
ANNEX A
DETERMINATION OF RESIDUE ON EVAPORATION
NOTE
APPARATUS
FIGURE: DISTILLATION APPARATUS
CLEANING LIQUIDS
PREPARATION OF APPARATUS
PROCEDURE
EXPRESSION OF RESULTS
PRECISION
MTO (LAW) SPECIFICATION
B.I.S. SPECIFICATION
TYPES AND GRADE OF WHITE SPIRIT
CHEMICAL NUMBERS
PHYSICAL PROPERTIES
WHITE SPIRIT TYPES 1–3 PHYSICAL PROPERTIES
REQUIREMENT AND TEST METHOD FOR PETROLEUM
HYDROCARBON SOLVENT
SCOPE
GRADES
REQUIREMENTS
PACKING AND MARKING
MARKING
EACH CONTAINER SHALL BE MARKED WITH THE FOLLOWING INFORMATION:
SAMPLING
SPECIFICATION OF SUPERIOR KEROSENE OIL
NOTE
PROPERTIES & CHARACTERSTICES TURPENTINE OIL
TURPENTINE OIL
HAZARD FLAMMABLE, MODERATE FIRE RISK:-
MARKET OVERVIEW OFWHITE SPIRIT
KEY PLAYERS OF WHITE SPIRIT
MANUFACTURERS/SUPPLIERS OF WHITE SPIRIT
WAREHOUSING OF WHITE SPIRIT
ANALYSIS LAWS TYPE-1
ANALYSIS LAWS TYPE-2
DERIVATION OF WHITE SPIRIT
MANUFACTURING PROCESS OF WHITE SPIRIT FROM KEROSENE OIL
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE
SERVICE IS:
PLANT LOCATION FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF KEROSENE OIL
SUPPLIERS OF PACKAGING DRUM
SUPPLIERS OF LAB TESTING CHEMICALS
SUPPLIERS OF PLANT & MACHINERY [IMPORTED]
SUPPLIERS OF PLANT & MACHINERY
SUPPLIERS OF MIXER
SUPPLIERS OF FILTER PRESS
SUPPLIERS OF LABORATORY EQUIPMENT AND LAB TESTING EQUIPMENT
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF STORAGE TANKS
SUPPLIERS OF PACKAGING MACHINERY
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)