Description
INTRODUCTION
TYPES OF ELECTRICAL WIRES
THERE ARE TWO MAIN TYPES OF WIRES: SOLID OR STRANDED.
COPPER WIRE
PROPERTIES
PROPERTIES OF COPPER WIRE:
ELECTRICAL CABLE
PVC COPPER CABLE
PROPERTY
APPLICATION
ADVANTAGES
ADVANTAGES OF PVC CABLES
SOME OF THE MAJOR ADVANTAGES OF PVC CABLES
CONSTRUCTION
CONDUCTOR
1. SOLID/STRANDED
A. SOLID
B. STRANDING
2. CIRCULAR/ SHAPED
A. CIRCULAR
B. SHAPED
INSULATION
THE FOLLOWING COLOUR CODE IS USED FOR IDENTIFICATION:
LAYING UP
INNERSHEATH
A. EXTRUDED INNERSHEATH
B. TAPPED INNERSHEATH
ARMOURING
OUTERSHEATH
USES AND APPLICATION
B.I.S. SPECIFICATION
SEQUENCES IN PVC CABLE MANUFACTURE
PVC CABLES MANUFACTURING: QUALITY CONTROL & STANDARDS
PROCESS FLOW CHART
MANUFACTURING PROCESS
(1) DRAWING
(2) ANNEALING
(3) STRANDING
(4) INSULATION
(5) QUALITY CONTROL
CABLES ARE MANUFACTURED AND UNDERGO THE FOLLOWING TESTS:
(A) TYPE TEST
1. THE FOLLOWING TESTS ARE TYPE TEST OF ELECTRICAL POWER CABLE.
PHYSICAL TESTS FOR INSULATION AND SHEATH
(B) ACCEPTANCE TEST:
(C) ROUTINE TEST:
CONDUCTOR RESISTANCE TEST OF ELECTRICAL POWER CABLES
TEST FOR THICKNESS OF INSULATION OF POWER CABLE
APPARATUS REQUIRED TESTING FOR THICKNESS OF INSULATION OF POWER CABLE
PROCEDURE FOR TESTING OF THICKNESS OF INSULATION OF POWER CABLE
ANNEALING TEST FOR WIRES AND CONDUCTORS
PROCESS OF ANNEALING TEST FOR WIRES AND CONDUCTORS
TENSILE TEST OF CONDUCTORS
APPARATUS REQUIRED FOR TENSILE TEST:
METHOD OF TENSILE TEST OF CONDUCTORS
PROCEDURE
PERSULPHATE TEST OF CONDUCTOR
WHY COPPER WIRES ARE TINNED?
METHODS
METHOD A:
METHOD B:
TEST SPECIMEN FOR TINNING TEST (FOR METHOD B)
WRAPPING TEST FOR CONDUCTORS
(6) COILING AND PACKING
MARKET OVERVIEW OF WIRE AND CABLE INDUSTRY
INCREASING DEMAND FOR RENEWABLE POWER GENERATION IS A VITAL TREND
GROWING DEMAND FROM DATA CENTERS AND IT FACILITIES IS A CURRENT TREND
DEMAND FOR CABLES IN RAILWAYS
5G INFRASTRUCTURE WILL CREATE THE DEMAND FOR CABLES
INDUSTRY CHALLENGES
FUTURE OF WIRE AND CABLE INDUSTRY IN INDIA
BUILDING BLOCKS OF INDUSTRY 4.0
BIG DATA AND ANALYTICS:
AUTOMATED ROBOTS:
HORIZONTAL AND VERTICAL SYSTEM INTEGRATION:
THE INDUSTRIAL INTERNET OF THINGS:
CYBER SECURITY:
ADDITIVE MANUFACTURING:
SIMULATION:
THE CLOUD:
AUGMENTED REALITY:
GLOBAL MARKET SCENARIO OF WIRE AND CABLE
SINGLE CORE CABLES CU/XLPE/PVC
PERMIT AND LICENSES FOR PVC CABLE MANUFACTURING
GET AN INCORPORATION CERTIFICATE
KEY POINTS TO PONDER
FACTORY LICENSE
TRADE LICENSE
NOC FROM SPCB
BIS CERTIFICATION
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF PVC COPPER WIRE
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF COOPER WIRE ROD
SUPPLIERS OF PVC COMPOUND CABLE GRADE
SUPPLIERS OF PACKAGING MATERIALS
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF WIRE DRAWING MACHINE
SUPPLIERS OF PVC EXTRUSION PLANT
SUPPLIERS OF ANNEALING FURNACE
SUPPLIERS OF WIRE STRANDING MACHINE
SUPPLIERS OF WIRE STRANDING MACHINE
SUPPLIERS OF ELECTRICAL MEASURING INSTRUMENTS
SUPPLIERS OF EOT CRANES
SUPPLIERS OF DG SETS
SUPPLIERS OF POWER TRANSFORMERS
SUPPLIERS OF COOLING TOWER
SUPPLIERS OF ETP PLANTS
SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS
SUPPLIERS OF AIR CONDITIONING EQUIPMENTS
SUPPLIERS OF AIR COMPRESSORS
SUPPLIERS OF WEIGHING MACHINE (PLATFORM TYPE)
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)