WIRE NAILS & WIRE DRAWING

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Wire nail are used to join many things in industries and  in other domestic items. The are made of hard carbon wire. These are Hattened  on one end and sharp at another end. The head  is  used for hammering and sharp  end help in penetrating into  the object which is to be joined. Wire nails used to join small items. These are of different  sizes. Wire drawing of metal is  also some what related to wire nails. First wires dre drawn by machines at high speed.  At present , maximum  wire drawing  speed  is som/sec, in medium   and fine wire range 60 to 65 m/sec. Some industries  are also  draw  at the speed of 80m /sec. It has been  found  however that  at  very  high  speed the relation  between  the  technical requirement  and  the increased  productivity is no longer  on  a sound  economic   level.  High charging speed  will  required  on extremely  high  quality of starting material  dies  and  drawing lubricants using conventional take up spools of higher  standards and   precisely  balanced.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

2.00 MT/Day

Land & Building

Area 600 Sq.Mtr Rs. 26.70 Lacs

Plant and Machinery

Rs. 20.17 Lacs

Working Capital for 1 Month

Rs. 16.44 Lacs

Total Capital Investment

Rs. 68.91 lacs

Rate of Return

40%

Break Even Point

52%