28 Project Reports on Profitable Multicrores (2 to 8 Crores)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Following are the 28 Project Reports:

  • Automatic Brick Plant
  • Aluminium Sulphate (Non Ferric)
  • Absorbent Cotton & Surgical Bandages (EOU)
  • Chocos (Ready-To-Eat Break Fast Cereal)
  • Calcium Carbonate (Precipitated and Activated)
  • Copper Powder
  • Cold Storage for Potato
  • Cashew Nut Processing
  • Dehydration of Onion and Garlic
  • Disposable Syringes with needle plant
  • Edible Oil Extraction & Refining
Category: Tag:

Description

  • Automatic Brick Plant
  • Aluminium Sulphate (Non Ferric)
  • Absorbent Cotton & Surgical Bandages (EOU)
  • Chocos (Ready-To-Eat Break Fast Cereal)
  • Calcium Carbonate (Precipitated and Activated)
  • Copper Powder
  • Cold Storage for Potato
  • Cashew Nut Processing
  • Dehydration of Onion and Garlic
  • Disposable Syringes with needle plant
  • Edible Oil Extraction & Refining
  • Flour Mill
  • Gur (Jaggery)
  • Hot Dip Galvanizing
  • HDPE Bottles
  • HDPE Pipes
  • Katha & Kutch
  • Menthol Crystals & Menthol Oil
  • Pine Apple Juice Manufacturing & Canning
  • Pan Masala
  • PVC Pipe and Fitting
  • Particle Board from Bagasse
  • Packaged Reverse Osmosis Drinking Water
  • Rubber & Flat Transmission belt Conveyor belt
  • TMT Steel Bars
  • Tyre Recycling
  • uPVC Doors & Windows Fabricating Plant
  • uPVC Profiles (Doors & Windows)

 

 Each DETAILED FEASIBILITY REPORT covers

  • Introduction
  • Uses and Applications
  • Properties
  • Market Position
  • Present Manufacturers
  • Process of Manufacture
  • Formulations
  • B.I.S. Specifications
  • Process Flow Sheet Diagram,
  • Cost Economics with Profitability Analysis
  • Capacity
  • Land & Building Requirements with Rates
  • List & Details of Plant and Machinery with their Costs
  • Raw Materials Details/List and Costs
  • Power & Water Requirements
  • Labour/Staff Requirements
  • Utilities and Overheads
  • Total Capital Investment
  • Turnover
  • Cost of Production
  • Break Even Point
  • Profitability
  • Land Man Ratio
  • Suppliers of Plant & Machineries and Raw Materials