Description
INTRODUCTION
THE ADVANTAGES OF AL ALLOY WHEEL ARE:
THE ADVANTAGES OF AL ALLOY WHEELS OVER THE STEEL WHEELS ARE:
TYPES OF AL ALLOY WHEELS
FIG-1 SINGLE PIECE FORGED WHEEL
FIG-2 SINGLE PIECE CAST WHEEL
FIG-3 MULTI PIECE WHEEL
PROPERTIES OF ALLOY WHEEL
USES AND APPLICATION
TECHNICAL SPECIFICATION OF ALUMINIUM ALLOY WHEEL
B.I.S. SPECIFICATION
PROCESS FLOW CHART FOR ALLOY WHEEL
MANUFACTURING PROCESS
LOW PRESSURES DIE CASTING
THE MAIN ADVANTAGES OF LOW-PRESSURE DIE-CASTING
ARE GIVEN AS [11]:
AL WHEEL PRODUCTION INVOLVES WITH SEVERAL PRODUCTION
STEPS. THESE STEPS ARE:
THERE ARE SEVERAL STEPS DURING THE PRODUCTION OF ALUMINUM
CASTING ALLOY WHEEL WHICH ARE GIVEN BELOW:
MELTING PROCESS
MELTING OF AL ALLOY FOR DIE-CASTING ENTAILS THREE DIFFERENT
TYPES OF OPERATIONS
MELT PREPARATION
THE PRIMARY PURPOSE OF MELT TREATMENT IS
(A) DEGASSING
DEGASSING PROCESS
MEASURING HYDROGEN CONCENTRATION
REDUCED PRESSURE TEST (STRAUBE-PFEIFFER)
QUANTITATIVE REDUCED PRESSURE TEST (SEVERN SCIENCE)
DENSITY MEASUREMENTS
INITIAL BUBBLE TEST (HYCON TEST):
RECIRCULATING GAS TEST (TELGAS, ALSCAN)
(B) FLUXING
X-RAY INSPECTION (REAL TIME RADIOSCOPIC INSPECTION)
FIGURE: REAL TIME RADIOSCOPIC IMAGE OF CAST AL ALLOY WHEEL
FIGURE: RADIOSCOPIC INSPECTION SYSTEM
FIGURE: SCHEMATIC VIEW OF AL WHEEL INSPECTING RTR SYSTEM
QUALITY CONTROL
FINISHING PROCESS
PAINTING
TESTING
MARKET POSITION
MARKET OVERVIEW
GROWTH DRIVERS AND CHALLENGES
MARKET SIZE AND FORECAST
KEY PLAYERS:
ON THE BASIS OF COATING TYPE, THE MARKET CAN BE SEGMENTED INTO
ON THE BASIS OF WHEEL SIZE, THE MARKET CAN BE SEGMENTED INTO:
ON THE BASIS OF VEHICLE TYPE, THE MARKET CAN BE SEGMENTED INTO:
ON THE BASIS OF SALES CHANNEL, THE MARKET CAN BE
SEGMENTED INTO:
AUTOMOTIVE ALLOY WHEEL MARKET: REGIONAL OUTLOOK
AUTOMOTIVE ALLOY WHEEL MARKET: MARKET PARTICIPANTS
GLOBAL MARKET OVERVIEW OF ALUMINIUM ALLOY WHEEL
FEW KEY PLAYERS IN THIS INDUSTRY ARE AS FOLLOWS:
MAJOR CLASSIFICATIONS OF ALLOY WHEEL ARE AS FOLLOWS:
MAJOR APPLICATIONS ARE AS FOLLOWS:
GLOBAL SCENARIO OF AUTOMOBILE INDUSTRY
CURRENT PROFILE OF THE INDUSTRY
TRENDS IN DOMESTIC PRODUCTION
AUTOMOBILE PRODUCTION TRENDS
TRENDS IN DOMESTIC SALES
AUTOMOBILE SALES TRENDS
TRENDS IN EXPORTS
AUTOMOBILE EXPORTS TRENDS
MARKET SEGMENT
AUTOMOBILE WHEEL MARKET
MARKET DYNAMICS
DRIVERS
RESTRAINTS
OPPORTUNITIES
CHALLENGES
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
PLANT LAYOUT
ADDRESSES OF RAW MATERIAL SUPPLIERS (IMPORTED)
ADDRESSES OF PLANT AND MACHINERY SUPPLIERS (IMPORTED)
SUPPLIERS OF ALUMINIUM ALLOY WHEEL
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF ALUMINIUM ALLOY INGOT
SUPPLIERS OF PICKLING ACIDS
SUPPLIERS OF PACKING MATERIALS
SUPPLIERS OF PAINT
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF LOW PRESSURE DIE CASTING MACHINE
SUPPLIERS OF ALUMINIUM MELTING FURNACE
SUPPLIERS OF CNC LATHE MACHINE
SUPPLIERS OF PAINTING EQUIPMENTS
SUPPLIERS OF DG SETS
SUPPLIERS OF EOT CRANES
SUPPLIERS OF POWER TRANSFORMERS
SUPPLIERS OF ELECTRICAL PANEL
SUPPLIERS OF ELECTRIC MOTOR
SUPPLIERS OF COOLING TOWER
SUPPLIERS OF EFFULENT TREATMENT PLANT (ETP PLANT)
SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS
SUPPLIERS OF AIR CONDITIONING EQUIPMENTS
SUPPLIERS OF AIR COMPRESSORS
SUPPLIERS OF PLATFORM WEIGHING MACHINE
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF SHOT BLASTING MACHINE
SUPPLIERS OF JIGS AND FIXTURE
SUPPLIERS OF SUBMERSIBLE WATER PUMP
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)