Description
INTRODUCTION
PROPERTIES
MECHANICAL PROPERTIES
ALUMINIUM CASTING
WROUGHT ALLOYS
FORMABILITY
USES AND APPLICATION OF ALUMINIUM SLUG
ALUMINIUM SLUGS FOR COLLAPSIBLE TUBES
MARKET OVERVIEW OF ALUMINIUM SLUG
PRESENT MANUFACTURE OF ALUMINIUM SLUGS
GLOBAL MANUFACTURES OF ALUMINIUM SLUG
1. RONDAL (IMPOL):
2. RHEINFELDEN:
RHEINFELDEN SUPPLIES SLUGS OVER THE WORLD FOR
THE PRODUCTION OF:
3. TALUM:
4. ALUMAN S.A.
5. BALL CORPORATION:
SLUG PRODUCTION PLANT
ALUMINIUM SLUGS CHARACTERISTICS & MANUFACTURING CAPABILITIES
THE APPLICATION AREA OF ALUMINUM SLUGS
HIGH QUALITY FEEDSTOCK
DIFFERENT TYPES OF SLUGS
SIZES OF SLUGS
THE DEGREE OF PROCESSING OF FINISHED SLUG
MINIMUM TEST BATCH OF SLUGS FROM 2 TONS.
SLUGS PACKAGING
THE STAGES OF PRODUCTION AND PROCESSING OF ALUMINUM SLUGS
PREPARATION OF METAL IN A MIXER
CASTING PREFORM FABRICATION
ALUMINUM ROLL DELIVERY TO STORAGE WAREHOUSE
SLUGS CUTTING PROCESS
SLUG ANNEALING
SLUG TUMBLING AND MECHANICAL PROCESSING
SLUGS PACKAGING
MANUFACTURING PROCESS
CASTING
ALUMINIUM FLAT ROLLING
SHEARING
METAL SHEET PRESS
ANNEALING
TESTING & QUALITY CONTROL
CLEANING & PACKAGING
PROCESS FLOW DIAGRAM
PROCESSING DETAILS OF ALUMINUM SLUG
THE PRODUCING PROCESS OF ALUMINUM SLUGS
THE WHOLE PROCESS CAN BE DIVIDED INTO 5 STEPS.
SMELTING
HOT/COLD ROLLING
STAMPING
ANNEALING (THERMAL TREATMENT)
SURFACE FINISH
SELECTION AND PACKING
ALUMINIUM AEROSOL CAN BY IMPACT EXTRUDING
AEROSOL CAN MANUFACTURING WITH IMPACT EXTRUSION
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TERM LOANS:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
PLANT LAYOUT
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF FURNACE
SUPPLIERS OF ROLLING MILL MACHINERY
SUPPLIERS OF HYDRAULIC PRESS
SUPPLIERS OF DRILLING MACHINE
SUPPLIERS OF PLANT AND MACHINERY (GLOBAL)
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF ALUMINIUM INGOT
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)