B.ED COLLEGE

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

              B.ED  College  is intended for conducting  couses  in   B.ED College.

Courses in B.ED are indispensable  for teacher’s training  in handling  / teaching the students in the college in a  methodical manner,  which is conducive to their better upbringing in  regard to imparting education to them as per the college curriculum.

The  early impressions formed in the students mind god  along way  in their further course of studies. So, it becomes  all  the more  imperative that best possible measures are adopted  in  the course  of  learning  of students at school level.  The  role  of teacher thus, becomes all the more of paramount siginificance. to accomsplish  this teacher traning course becomes all the more  an essential  need  for  which  B.ED   course  is  very   necessary. Institutes that condnct B.ED Courses aim to fulfil this mission.

Project Reports Cover:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

100 Student Per year

Land & Building

Area 8000 Sq.mtr Rs. 4.14 Cr

Plant and Machinery

Rs. 56.65 Lacs

Working Capital for 3 Months

Rs. 35.30 Lacs

Total Capital Investment

Rs. 5.19 Cr

Rate of Return

9%

Break Even Point

76%