BIO GAS PRODUCTION & BOTTLING PLANT (1500 CUBIC PETER PER DAY)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

           Energy is becoming a scarce and costly input in the world. Oil  which  accounts  for  a  sizeable  portion  of  our   energy consumption,  has  been making a very heavy tax  on  our  foreign exchange resources. Other than coal, we must also find alternate resources of energy centered around solar, wind, tidal  and  bio-gas. An effective bio-gas programme leads to efficient use of cow dung for gas recovery and partial supplement to plant nutrient requirement.  Bio-gas  programme leads to  improvement  in  rural living including rural sanitation.

Conventional   bio-gas digesters set up in India   were predominantly of the Khadi Village Industries Commission Model. Recently  Janta Bio-gas plant designed by Planning  Research  and Action Division (PRAD) of State Planning Institute, Lucknow based on  bio  gas  technology  has proved  to  be  comparatively  more economical. Several Janta Biogas plants have been constructed  in Uttar Pradesh and a few in Haryana.

   Project Report Covers:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

1500.00 CUBIC METER PER DAY/day

Land and Building

Area 2000 Sq.Mtrs. Rs. 1.40 Cr

Plant & Machinery

Rs. 1.00 Cr

Working Capital 3 Months

Rs. 40.00 Lacs

Total Capital Investment

Rs. 4.86 Cr

Rate of Return

26%

Break Even Point

50%