CARBOXY METHYL CELLULOSE (CMC)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Carboxy   Methyl  Cellulose,  a  chemical  of   demonstrated
usefullness   in   scores  of  applications  and   of   suggested
applicability in hundreds, nevertheless required several  decades
to  attain  genuine  industrial status.  The  product  was  first
developed in Germany toward the end of World War I by Jansen, but
it  was until the late 1930’s and particularly during  and  since
world War II. that large scale uses began to energe &  commercial
production appeared justified.

Following  the  appearance  of  a  report,  the   detergency improving  characteristics of SCMC were confirmed  in  laboratory tests.   Extensive  investigations were under taken  by  research groups  with a view toward developing a CMC with the  high  grade soaps  and synthetic detergents already available on the  market.  At  the same time production methods were subjected to  scruting.   CMC had received the impetus necessary for the launching of a new Industrial  Chemical,  &  a  start  had  been  made  toward   the development of a process for its manufacture.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

10.00 Ton/Day

Land & Building

Area 5000 Sq.Mtr Rs. 2.76 Cr

Plant and Machinery

Rs. 1.96 Cr

Working Capital for 3 Months

Rs. 5.16 Cr

Total Capital Investment

Rs. 10.30 Cr

Rate of Return

28%

Break Even Point

55%