DATA PROCESSING CENTRE

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

        Software and software services have become the order of day.  Organising the development and distribution of these services  is largely  handled by computer  centres. The  different  services which will be provided by  the  computer centre considered here are

(i)   Software services
(ii)   Computer programming classes and
(iii)  Industrial computer packages.

Besides,  the job the date processing can also be taken  up, depending upon the reuirements of local clients.

  Project Report Covers:

Introduction
Uses and Applications
Properties
Market Survey with future aspects
Present Manufacturers
B.I.S. Specifications
Manufacturing Process with Formulae
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials
Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials.

Category: Tag:

Additional information

Plant Capacity

DATA PROCESSING CENTRE

Land and Building

Area 600 Sq.Mtrs. Rs. 52.00 Lacs

Plant & Machinery

Rs. 2.14 Lacs

Working Capital for 1 Month

Rs. 2.38 Cr

Total Capital Investment

Rs. 58.22 Lacs

Rate of Return

46%

Break Even Point

38%