DETERGENT POWDER (SURF EXCEL & WHEEL TYPE)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

         Synthetic detergents occupy a vital place in the present age particularly when the modern society is constantly looking for quick, effective and economic cleaning agents. Synthetic detergents emerged as a regular industry after second world war only. The development of this industry is closely linked with Petro-chemical industry which forms the basic for its raw materials.

Detergents when dissolved in water, acquire better cleaning properties and hence facilitates easy removal of dirt & dust and grease etc.

•    INTRODUCTION
•    PROPERTIES OF WASHING SOAP AND WASHING 8
•    USES AND APPLICATION
•    B.I.S. SPECIFICATIONS
•    RAW MATERIAL REQUIREMENT
•    MARKET SURVEY
•    PRESENT MANUFACTURERS/SUPPLIERS/EXPORTERS OF DETERGENT POWDERS
•    MANUFACTURE OF DETERGENT POWDER
•    PROCESS OF MANUFACTURE OF WASHING DETERGENT POWDER
•    SURF EXCEL TYPE DETERGENT POWDER
•    PROCESS OF MANUFACTURE OF WASHING DETERGENT POWDER
(WHEEL TYPE)
•    HIGHER GRADE/QUALITY ARIEL TYPE DETERGENT POWDER
•    FORMULATION OF DETERGENT POWDER, SURF EXCEL TYPE
•    FORMULATION OF DETERGENT POWDER, WHEEL TYPE
•    OTHERS FORMULATION AND PROCESS OF GOOD QUALITY
DETERGENT POWDER
•    FORMULATIONS
•    RAW MATERIALS
•    METHODS FOR PERFORMANCE TESTS FOR SURFACE ACTIVE AGENTS
•    PROCESS OF MANUFACTURE OF WASHING DETERGENT POWDER
•    SURF EXCEL TYPE DETERGENT POWDER
•    PLANT LAYOUT
•    PRINCIPLES OF PLANT LAYOUT
•    PLANT LOCATION FACTORS
•    EXPLANATION OF TERMS USED IN THE PROJECT REPORT
•    PROJECT IMPLEMENTATION SCHEDULES
•    SUPPLIERS OF RAW MATERIALS
•    SUPPLIERS OF PLANT AND MACHINERY

APPENDIX –A

01.    PLANT ECONOMICS
02.    LAND & BUILDING
03.    PLANT AND MACHINERY
04.    OTHER FIXED ASSESTS
05.    FIXED CAPITAL
06.    RAW MATERIAL
07.    SALARY AND WAGES
08.    UTILITIES AND OVERHEADS
09.    TOTAL WORKING CAPITAL
10.    TOTAL CAPITAL INVESTMENT
11.    COST OF PRODUCTION
12.    TURN OVER/ANNUM
13.    BREAK EVEN POINT
14.    RESOURCES FOR FINANCE
15.    INSTALMENT  PAYABLE IN 5 YEARS
16.    DEPRECIATION CHART FOR 5 YEARS
17.    PROFIT ANALYSIS FOR 5 YEARS
18.    PROJECTED BALANCE SHEET FOR (5 YEARS)

Additional information

Plant Capacity

1000.00 Kgs./day

Land and Building

Area 600 Sq.Mtrt) Rs. 88.00 Lacs

Plant & Machinery

Rs. 10.50 Lacs

Working Capital for 1 Month

Rs. 19.00 Lacs

Total Capital Investment

Rs. 1.20 Cr

Rate of Return

28%

Break Even Point

54%