FABRICATION & ASSEMBLY FOR RAILWAY

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

        Fabrication   and  assembly  industry  for  Railway  is    a specialized  industry of paramount importance & bridges  the  gap between  the  main  producer of steel and  its  consumers.   This industry is essentially of a jobbing type and covers a vast range of widely different structural.  Attempt may be made to find  the broad  limits  of the industry in terms of  the  basis  processes undertakes.

Fabrication  and assembly for railway find extensive use  in various developmental activaties though the range as a DE  spares and  components  for  manufacture  of  Road  and  Railway   track construction and maintenance  and extent of their utilization may vary from one sector to another. Among the fabrications  required by  specific  sectors  of the economy,  the  important  ones  are gearbox  and axle drives for road construction and railway  track manufacturing industries.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

400.00 MT/Day

Land & Building

Area 900.00 Sq.Mtr Rs. 85.75 Lacs

Plant and Machinery

Rs. 76.00 Lacs

Working Capital for 3 Months

Rs. 1.22 Cr

Total Capital Investment

Rs. 2.97 Cr

Rate of Return

19%

Break Even Point

59%