Additional information
Plant Capacity | 1 Kg/Day |
---|---|
Land & building | Rs.1.02 Cr. |
Plant & machinery | Rs. 6.55 Lacs |
W.c for 1 month | Rs. 4.72 Cr. |
Total capital investment | Rs. 5.84 Cr. |
Rate of return | 41% |
Break even point | 30% |
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.Gold is normally electro deposited from a solution containing essentially a double cyanide of Gold and an alkali metal, additional alkali cyanide (free cyanide) and other alkaline compounds. This solution is usually produced from gold potassium cyanide or sometimes from gold cyanide or gold potassium cyanide. For electro-plating process anodes used are usually that stainless steel (alkaline process), platinized titanium or carbon (acid process) or gold (acid and alkaline process).
Project Report covers:
Plant Capacity | 1 Kg/Day |
---|---|
Land & building | Rs.1.02 Cr. |
Plant & machinery | Rs. 6.55 Lacs |
W.c for 1 month | Rs. 4.72 Cr. |
Total capital investment | Rs. 5.84 Cr. |
Rate of return | 41% |
Break even point | 30% |