MEDICAL COLLEGE WITH ATTACHED HOSPITAL FACILITY (500 BEDS)
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.
Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.
In the very beginning, There were government owned hospitals where one had to pay no money for treatment. Then, a private ward facility was started in the hospitals. The patient had to pay rent for a private room while medicines and doctors were available free of cost. The private ward helped the patient to avoid the untideness of a general ward and noise etc. The patients, who were in a position to afford the room rent, were admitted to private rooms. The poor’s, however, got admission in rushed general wards.
Increasing negligence by the doctors of these hospitals and the overcrowding in them gave private hospitals to have a good business. No. of private hospitals began to come in light with all facilities for E.C.G.S, X-Rays, Laboratories, 24-hours emergency and admission facilities for ill persons, seriously injured in pregnant ladies. The medium class and high class families started preferring these private hospitals and nursing homes as one’s life is considered to be much costly and expenses for treatment can be neglected
Project Report Covers:
Introduction
Uses and Applications
Properties
Market Survey with future aspects
Present Manufacturers
B.I.S. Specifications
Manufacturing Process with Formulae
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials
Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials.