MINERAL WATER AND PET BOTTLING PLANT
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.
Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.
Mineral Water originally meant water from various natural springs which are thought to be having medicinal and curative value. These spring waters, although contain dissolved chemicals of medicinal properties, also contain harmful micro-organisms. Besides this the underground and surface water is also not potable due to hardness as well as due to presence of toxic substances and Bacteria. This re-quires suitable treatment and purification to make it safe and potable drinking water with long shelf life. The water is packed in suitable food grade packing generally in PVC or PET Bottles of different capacities. Water in its pure from is oxide of hydrogen or hydride of Oxygen. It is transparent and colourless liquid with a melting point of zero degree Celsius and a boiling point of 100 degree Celsius. Its refractive index is 1.00 and specific gravity 1.0. Pure water is tasteless, however the presence of minerals and dissolved salts and gases impart taste in the water. Depending upon the quality of Raw water, suitable treatment is given to the water to make it as per the standards and packed in food grade plastic Bottles with label Indicating details of composition, date of bottling, expiry date, quantity etc.
DETAILED FEASIBILITY REPORT COVERS:
- Introduction
- Uses and Applications
- Properties
- Market Survey with future aspects
- Present Manufacturers
- B.I.S. Specifications
- Manufacturing Process with Formulae
- Plant Layout
- Cost Economics with Profitability Analysis
- Capacity
- Land & Building Requirements with Rates
- List & Details of Plant and Machinery with their Costs
- Raw Materials
- Details/List and Costs
- Power & Water Requirements
- Labour/Staff Requirements
- Utilities and Overheads
- Total Capital Investment
- Turnover
- Cost of Production
- Break Even Point
- Profitability
- Land Man Ratio
- Suppliers of Plant & Machineries and Raw Materials.