IT Park

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

The  Park at Greater Noida will be designated  and  equipped
with the latest infrastructure not only to meet the  requirements
of the technologyoriented companies in IT & IT enabled  services,
electronics,  telecommunication and related  services,  but  also
provide  the concerns in infrastructure support of  uninterrupted
power  supply, high speed data communication  services  including
leased  line connectivity and optic fibre back bone  network  and
export  facilitation  IT infrastructure. The park will  not  only
provide  the space for commercial area for shops, hotels,  cinema
halls  at  its  location but also provide the  space  for  public
utility  services, religious buildings, health clubs,  recreation
centres,     banking    &    financial     services,     business
centres/conference facilities along with the specified  earmarked
area for residential use, guest house and for staff quarters. The
main features are as under:

Project Report Covers:

Introduction
Uses and Applications
Properties
Market Survey with future aspects
Present Manufacturers
B.I.S. Specifications
Manufacturing Process with Formulae
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials
Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials.

Category: Tag:

Additional information

Plant Capacity

IT PARK

Land & Building

Area 1000 Sq.Mrs. Rs. 1.28 Cr.

Plant and Machinery

Rs. 30.00 Lacs

Working Capital for 1 Month

Rs. 9.13 Lacs

Total Capital Investment

Rs. 1.81 Cr.

Rate of Return

92%

Break Even Point

33%