PARTICLE BOARD FROM RICE HUSK OR WOOD WASTE OR SUGARCANE BAGASSE OR MIXED OF ALL ABOVE CAP: 4 TON/DAY

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Development of particle and fibre board has been consequential to man’s quest for optimum utilization of timber and wood wastes which earlier were used mainly as fuel.

Initial development of particle board took place in Germany during the Second World War when its timber supplies were practically cut-off from the supplying countries. Particle board plants were set up in postwar West Germany to meet the demand for reconstruction. In the fifties particle board manufacturing plants were set up in Europe and USA. The industry has now developed throughout the world.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

4.00 MT/Day

Land & Building

Area 4000 Sq.Mtr Rs. 5.41 Cr

Plant and Machinery

Rs. 1.25 Cr

Working Capital for 2 Months

Rs. 50.84 Lacs

Total Capital Investment

Rs. 7.30 Cr

Rate of Return

36%

Break Even Point

43%