PVC Insulation Tape

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Tamarind powder is produced from the Kernels of Tamarinds. It is used in the manufacture of the tamarind gum. Tamarind gum is seed gum with potential industrial  application.  It is obtained from the seed kernels of the tamarind.

The original electrical insulating tape was made of cloth tape impregnated with Chatterton’s compound, an adhesive material manufactured using Gutta-percha. This type of tape was often used to insulate soldered splices on knob and tube wiring.
In the early 1940s, vinyl plastic emerged as a versatile material for a wide range of applications, from shower curtains to cable insulation. A major ingredient in vinyl film was tricresyl phosphate (TCP), which was used as a plasticizer. Unfortunately, TCP tended to migrate, giving the surface of the vinyl film an oily quality and degrading every tape adhesive known. Research chemists and engineers at 3M set out to create a dependable, pressure-sensitive tape made of vinyl film that would have the required electrical, physical and chemical properties.

Project Report Covers:

Introduction
Uses and Applications
Properties
Market Survey with future aspects
Present Manufacturers
B.I.S. Specifications
Manufacturing Process with Formulae
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials
Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials.

Category: Tag:

Additional information

Plant Capacity

5.00 MT/Day

Land & Building

Area 5000 Sq.Mtrs. Rs. 5.91 Cr

Plant and Machinery

Rs. 4.66 Cr

Working Capital for 1 Month

Rs. 2.15 Cr

Total Capital Investment

Rs.13.55 Cr

Rate of Return

52%

Break Even Point

36%