Recovery of Gold from P.C.B & Other Electronics Waste

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

          Gold  a bright yellow metal with resplendent luster.  It  is exceedingly  malleable  and ductile.  It can be beaten  into  the sheets  so  thin  that 2,50,000 of them may be  placed  one  over another  to  form a pile one inch in thickness, it can  be  drawn into wires so thin that a length equal to 50 miles weight just  1 oz.   It  does not oxidize in air or oxygen at any temp.   It  is unaffected  by the hydrochloric acid, nitric acid  and  sulphuric acid, even at temp. 100oC. A mixture of hydrochloric acid  (Aqua Regia)  dissolves  the metal.  It is not attacked by  the  alkali hydroxides, sulphur and sulphur dioxide, but is acted upon by the hydrogens, bromine being the most active.  It readily amalgamates with mercury, a properly which has been taken advantage of in the extraction of gold from antiferrous sand in which gold is present  in a finely dispersed form.

Project Reports Cover:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

100.00 GMS/Day

Land & Building

Area 500 Sq.mtr Rs. 45.50 Lacs

Plant and Machinery

Rs. 10.80 Cr

Working Capital for 3 Months

Rs. 87.64 Lacs

Total Capital Investment

Rs. 1.46 Cr

Rate of Return

154%

Break Even Point

14%