S.G.IRON & ALLOY STEEL CASTINGS

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Foundry  is  one of the oldest  industries.  However  Indian foundries  have  so far been of conventional type.  But,  in  the modern  industrial  arena,  competitiveness of a  foundry  is  of utmost importance.

The  foundry units are becoming more-and-more  automated  in order to improve efficiencies. Modern metal melting furnaces  are designed   from  the  view  points  of   minimising   pollutions, maximising energy savings and suitably to use frequently changing raw  materials.  Process parameters are strictly  controlled  and adjusted    automatically   with   the   built-in    devices    & instrumentations. All these latest provisions are required to  be introduced  in  foundries today which push up the  capital  costs greatly.  This  high  capital cost needs  to  be  compensated  by installing  high capacity furnace for large quantity  production. It  also  requires  to produce value added  products  as  far  as possible.   Certain  operational  precautions  are   additionally required,   loading   to  maximum  material   utilization,   less rejections and highest recovery.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

25.00 Ton/Day

Land & Building

Area 4000 Sq.Mtr Rs. 2.15 Cr

Plant and Machinery

Rs. 1.36 Cr

Working Capital for 2 Months

Rs. 5.86 Cr

Total Capital Investment

Rs. 10.95 Cr

Rate of Return

59%

Break Even Point

49%