Description
INTRODUCTION
SPECIFICATION OF CAR
HOW ELECTRIC CARS WORK
WORKING OF AN ELECTRIC CAR
BLOCK DIAGRAM OF AN ELECTRIC CAR
TYPES OF BATTERIES
CHARGING OF ELECTRIC VEHICLES (EV)
DIFFERENCE BETWEEN ELECTRIC ENGINE AND GASOLINE ENGINE
ADVANTAGES OF AN ELECTRIC CAR
DISADVANTAGES OF AN ELECTRIC CAR
CURRENT CHALLENGES WITH ELECTRIC CARS
B.I.S. SPECIFICATION
PROCESS FLOW CHART
ASSEMBLING PROCESS OF ELECTRIC CAR
RAW MATERIALS
DESIGN
THE MANUFACTURING PROCESS
BODY SHOP
GENERAL ASSEMBLY OF ELECTRICAL CAR
ASSEMBLING OF ELECTRIC CAR
THERE ARE 6 MAIN PARTS YOU NEED:
THE STEPS WOULD BE SOMETHING LIKE THIS:
MARKET OVERVIEW
INDIA ELECTRIC CAR MARKET, BY END-USER, UNITS (2013-2025)
MAJOR PLAYERS
RECENT DEVELOPMENTS
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
PLANT LAYOUT
SUPPLIERS OF ELECTRIC CAR
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF MOTOR
SUPPLIERS OF BATTERY PACK
SUPPLIERS OF MOTOR CONTROLLER
SUPPLIERS OF CHASSIS FRAME
SUPPLIERS OF REAR AXLE
SUPPLIERS OF DIFFERENTIAL
SUPPLIERS OF WHEEL
SUPPLIERS OF BATTERY CHARGER
SUPPLIERS OF LIGHT ASSEMBLY
SUPPLIERS OF BRAKES
SUPPLIERS OF CHASSIS
SUPPLIERS OF CAR BODY
SUPPLIERS OF CAR WHEEL RIM
SUPPLIERS OF CAR TYRES
SUPPLIERS OF STEERING
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF ASSEMBLY LINE
SUPPLIERS OF EOT CRANE
SUPPLIERS OF POWER TRANSFORMERS
SUPPLIERS OF ELECTRICAL PANEL
SUPPLIERS OF ELECTRIC MOTOR
SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS
SUPPLIERS OF AIR CONDITIONING EQUIPMENTS
SUPPLIERS OF AIR COMPRESSORS
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF SHOT BLASTING MACHINE
SUPPLIERS OF JIGS AND FIXTURE
SUPPLIERS OF SUBMERSIBLE WATER PUMP
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)