STEEL FORGING (AUTOMOBILE PARTS)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

The forging industry, as it is known today, makes use of various types of forging equipment for the practical duplication of forged parts for commercial services such forging equipment includes the drop hammer, the trip and halve hammer, the forging machine (upsetter), the mechanical and hydraulic forging press, and the single and double frame general forging hammers. This industry with the present mechanical equipment is primarily a development of our modern times and its status as such extends back less than one hundred years. The background of the forging of metal, however, reaches as far back as civilization itself and practically every historic record gives evidence of the importance the forging of metal held in the life of every people of every era. Museum offer visible proof that the forger has been at work throughout the year in very commendable manner. Just when and where the art of forging came into use, history is not able to define very clearly. It can probably be deduced from the bit of facts gleaned from the bit of facts gleaned from legends, records, and relics that the forgin art was long in use before there existed written records. Iron was doubtlessly used first in Western Asia, the birth place of the human race, and in the surround regions.

DETAILED FEASIBILITY REPORT COVERS:

  • Introduction
  • Uses and Applications
  • Properties
  • Market Survey with future aspects
  • Present Manufacturers
  • B.I.S. Specifications
  • Manufacturing Process with Formulae
  • Plant Layout
  • Cost Economics with Profitability Analysis
  • Capacity
  • Land & Building Requirements with Rates
  • List & Details of Plant and Machinery with their Costs
  • Raw Materials
  • Details/List and Costs
  • Power & Water Requirements
  • Labour/Staff Requirements
  • Utilities and Overheads
  • Total Capital Investment
  • Turnover
  • Cost of Production
  • Break Even Point
  • Profitability
  • Land Man Ratio
  • Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

4 Ton./Day

Land & Building

(Area 1500 sq.mt.) Rs. 1.62 Cr.

Plant & Machinery

Rs. 49 Lacs

W.C. for 2 Months

Rs. 1.16 Cr.

Total Capital Investment

Rs. 3.38 Cr.

Rate of Return

45%

Break Even Point

47%